background image

Instructions

DH-SMT/PL

VI.KR.Z1.02  ©

  Danfoss 09/2006

7

Akva Vita TDP-F - district heating flat station for direct HE and DHW

Thermostatic by-pass (optional)

As an option the flat station can be equipped 

with a by-pass thermostat, Danfoss FJVR, which 

ensures that hot water is available immediately 

when tapping starts. It is recommended to set the 

thermostat in pos. 3.

If the water temperature rises too slowly it can be 

necessary to set the thermostat at higher value, 

however, not higher than in position 4.

DHW circulation (optional)

As an option the flat station can be equipped with 

connection pipe for circulation with adjustable 

setting of DHW circulation. If the Akva Vita TDP-F 

flat station is connected to the circulation system 

in the building, the thermostat will control the 

circulation water temperature. This ensures that 

hot water is available at the tap point without any 

waiting time and water waste. It is recommended 

to set the thermostat in pos. 2-2,5. If the circulation 

pump is switched off, the thermostat should be 

closed. In case the Akva Vita TDP-F flat station has 

been delivered with by-pass control and this must 

be changed to DHW circulation, this can be done 

by performing control change from by-pass to 

circulation, as described on page 3.

Approximate thermostat scale setting:

I  =  10 °C

1  =  20 °C 

2  =  30 °C

3  =  40 °C

4  =  45 °C

I  =  50 °C (max. temp.)

5. Filters

Filters should frequently be cleaned from sediments 

by authorized personnel, according to producer’s 

instructions and depending on the flat station’s 

operating conditions.

Maintenance

It  is  necessary  to  check  and  maintain  the  flat 

station on a regular basis in order to keep it in 

good operating condition. 

The frequency of the maintenance and service 

inspections  should  be  according  to  system 

manufacturer specifications and local legislation. 

However, maintenance inspections should take 

place at least twice each year (before and after the 

heating season). 

In addition to the check of the flat station as to its 

functionality, it is also recommended to check if the 

following system  parameters are compliant with 

the requirements of the system manufacturer and 

local regulations:

- no leakages, 

- correct temperatures in the distribution 

network,

- stable district heating supply and return 

temperatures,

- correct cooling of the district heating supply,

- DHW temperature (requested temperature 

should be in accordance with the local 

regulations),

- pressure drops in filtering and water 

conditioning plants (filters, sludgers etc.),

- pressure drops in the heat exchanger (primary 

and secondary side of heat exchanger).

The flat station operator should consider the above 

parameters  and  prepare  written  maintenance 

reports. 

Service  inspections  by  authorized  personnel 

are  usually  more  precise  (complex)  than  user 

maintenance inspections and the intervals between 

them are longer.

Summary of Contents for Akva Vita TDP-F

Page 1: ...s DH SMT PL VI KR Z1 02 Danfoss 09 2006 1 Akva Vita TDP F Table of contents Akva Vita TDP F 1 Table of contents 1 Safety notes 2 Delivery 2 Transport and storage 2 Mounting 3 Pipes connections 4 Elect...

Page 2: ...he at station has not been damaged during transport Noise level 55 dB Corrosion protection All pipes and components are made of stainless steel and brass The maximum chloride compounds of the ow mediu...

Page 3: ...pillary tube with union nut from pos 3 to pos 2 Screw the conical screw from pos 2 4 mm on to the mu at pos 3 Connect circulation installation system with connection pipe for circulation Remember pump...

Page 4: ...s the primary supply for the tted substations enabling the Danfoss Redan substations to be used in numerous schemes with di erent energy sources depending on the local operating conditions In order to...

Page 5: ...be equipped with an electronic programmable room thermostat and a zone valve with actuator In this case temperature is controlled by the room thermostat and radiator thermostats Please note that the r...

Page 6: ...If it is not possible to set the temperature according to the above recommendations it is recommended to change the standard controller setting PM controller The PM controller can operate in three ba...

Page 7: ...1 20 C 2 30 C 3 40 C 4 45 C I 50 C max temp 5 Filters Filtersshouldfrequentlybecleanedfromsediments by authorized personnel according to producer s instructions and depending on the at station s oper...

Page 8: ...logged Defective non return valve in thermostatic battery DHW tap temperature lower than DHW from at station Defective non return valve in hot water circulation circulation return pipe is getting cold...

Page 9: ...t in the zone valve housing Air pockets in the system Clean gate strainer Clean the lter after consulting the district heating plant Check the operation of the di erential pressure controller clean th...

Page 10: ...33 35 DK 8240 Risskov Denmark Phone 45 87 43 89 43 Fax 45 87 43 89 44 redan danfoss com www redan danfoss dk Akva Vita TDP F district heating at station for direct HE and DHW Instructions DH SMT PL VI...

Reviews: