Rigging/derigging
3.2.2 Mixed ground stack
To set up a mixed ground stack, the Base plate is equipped with an
M20 hand bolt
[2], which can be attached to the M20 threaded
insert of the respective subwoofer.
Þ
Simply fit the Base plate onto the M20 threaded insert of the
subwoofer and tighten the hand bolt.
The assembly of the A-Series cabinets on top of the subwoofer is
carried out in the same manner as described in the previous
chapter.
Horizontal alignment
In addition, the assembly on top of the subwoofer can be
horizontally aligned to the left or to the right. However, due to the
rubber feet of the Base plate, the angle is limited to 5° since the
front rubber feet should always rest on the top panel of the
subwoofer.
Þ
To perform the alignment, slightly slacken the hand bolt, align
the assembly and retighten the hand bolt.
3.3 Derigging
To dismantle any of the assemblies, follow the corresponding
rigging and setup instructions in reverse order.
The same safety instructions apply!
Refit the Splay link
During setup, the Splay link of the last cabinet has been removed
and must be refitted to the cabinet. For this purpose, proceed as
follows:
1. Release the Locking pin
[1].
2. Turn the extension tube head
[2] by 90°.
3. Insert the Splay link into the rigging strand
[3].
4. Refit the fixing bolt
[4].
5. Refit and lock the ring cotter
[5].
6. Fold the Splay link back into its park position
[
Þ
] and
reinsert the Locking pin.
d&b Z5458
AL Base plate Rigging manual 1.1 en
14