Reference
Version
Document
Lang.
Page
3000-ENG
08.01.2018
3000 DAN DRYER Hand dryer.
Maintenance and service manual
UK
11 of 12
DAN DRYER A/S • Alsikevej 8 • DK-8920 Randers NV • www.dandryer.com • [email protected]
Warning !!!
During cleaning and service the hand dryer
must always be disconnected from the power
supply
Heating element replacement
1. Disconnect power supply.
2. Disassemble cover by removing the two cover
screws at the bottom of the housing. Use the
special Allen key which was originally supplied
with the hand dryer.
3. Disconnect wires from timer unit.
4. Disassemble sensor bracket and
timer unit from fan housing.
5. Loosen the two screws and dismount fan housing
from base plate.
9. Reassemble all components and test run
the hand dryer.
6. Loosen the screws and disassemble air outlet
from fan housing.
7. Disassemble heating element from air outlet.
8. Assemble new heating element and reassemble
all other components.