Dake Corporation
724 Robbins Road
Grand Haven, MI 49417
www.dakecorp.com
11
REV012019
5. Clean both sides of the flange that are on either side of the blade and return the inside
flange to its place.
6. Clean all surfaces of the new blade before putting the new blade on.
a. Make sure the teeth are in the downward position, and blade turns clockwise.
b. Line up the holes of the blade with the flange pinholes of the first flange half.
7. Making sure the flange pins are lined up with the pinholes through the blade put the
second half of the flange back on to hold the blade in place.
8. Start to thread the blade bolt back on.
9. While tightening the blade bolt (counter-clockwise to tighten), pull the blade up in reverse
direction and hold it in place as tightening the bolt until it is secure.
a. This is important to remove the back lash.
10. Return safety guard back in position and secure it by screwing the safety guard bolt back
in to place.