background image

Locate the UBR centralised to the pool in the position desired to anchor it down.

 

*

Do Not anchor down at this point

*

a.   Install pool cover.

b.   Connect pool cover to roller using the cords and eyelets. Align the centre Feather Plug on the tube and mark 

the pool cover about 100mm in from the edge of the pool cover. Punch a hole through the cover with the 

eyelet punch supplied.

c.   Install eyelets. Place the male half of the eyelet under the punched hole and female half on the top. Tap 

together on the ground.

d.   Secure cord to cover and roller. Tie a loop at one end and attach to Feather Plug on roller. Thread other end 

through cover eyelet and tie off to cord adjuster or bowline knot.

e.   Repeat for all cord attachments, then adjust the cords so the cover comes onto the roller tube evenly. Start 

from the centre and work out to the ends, aiming to set cords to retrieve evenly. Minor adjustments may be 

needed to fine tune the settings for smooth cover retrieval.

Make sure the pool cover goes on and off the pool and roller smoothly before you fix it down. Mark the ground 

through the anchor tabs of the frame 

Note: 

You may need someone to hold the UBR to stop it moving around to 

ensure correct UBR location.

a.  Move UBR out of the way.

b. Drill 2x 10mm holes per frame.

c.  Move UBR back into position.

d. Tap in the anchors and tighten.

INSTALLATION

 

CONTINUED

9.

10.

Summary of Contents for Under Bench Roller

Page 1: ...pool covers rollers Quality I Technology I Service AUSTRALIA S FAV URITE 1300 55 18 11 daisypoolcovers com au Installation Instructions Under Bench Roller...

Page 2: ...supports Make sure opening of centre C support is facing towards pool 1x tube assembly with M8x 20mm retaining bolt and washer 1x hand wheel adaptor with M8x 40mm retaining bolt 1x hand wheel 1x cover...

Page 3: ...eel to adaptor using the 6x screws in the adaptor Starting from one end note coloured dots on frame and plank insert one end frame onto the 2 planks while lining up the bolt holes You may need to clip...

Page 4: ...mounting bolts do not tighten Once you confirm the tube turns freely tighten all frame mounting bolts It is easier to get someone to help carefully roll over the UBR and locate it where you want to an...

Page 5: ...ttach to Feather Plug on roller Thread other end through cover eyelet and tie off to cord adjuster or bowline knot e Repeat for all cord attachments then adjust the cords so the cover comes onto the r...

Page 6: ...ve to freew Drive in operation section 2 Without the drive motor inside the tube mark and drill 6x 4 5mm holes through the template with the 4 5mm drill bit there are 3 holes to be drilled around the...

Page 7: ...tant make sure recess is facing DOWN when mounting to frame to avoid water filling up inside 7 Install the control housing secure firmly the 4 x mounting bolts 8 Plug in the drive motor wire to the co...

Page 8: ...ing a button Battery condition light only illuminates when 1 PV solar panel available or 2 AC available or 3 During and immediately after operation for approximately 60 seconds after operation ceases...

Page 9: ...ole operation that you want to program don t release the button then press it again until the cover has come off to the desired position on the roller then release the directional button to stop opera...

Page 10: ...en light Full charged battery voltage 11V AC charger light Red Light Charging the battery voltage 10 5V Yellow light Charging the battery voltage 10 5V 11V Green light Full charged battery voltage 11V...

Page 11: ...icator lights image on this page After fully recharging for a minimum of 3 days to report any fault record what is happening when you test operation press button now AC charger when plugged in will op...

Page 12: ...o this page Register online now at daisypoolcovers com au AUSTRALIA S FAV URITE 1300 55 18 11 hello daisypoolcovers com au daisypoolcovers com au Quality I Technology I Service OPERATION Service Call...

Reviews: