The units were checked for leaks by the manufacturer.

After connecting the field piping, perform the following inspections.

1

Preparations

Referring to 

figure 24

, connect a nitrogen tank, a cooling tank,

and a vacuum pump to the outdoor unit and perform the
airtightness test and the vacuum drying. The stop valve and
valves A and B in 

figure 24

 should be open and closed as shown

in the table below when performing the airtightness test and
vacuum drying.

2

Airtightness test and vacuum drying

Airtightness test:

Pressurize the liquid and gas pipes to 4.0 MPa (40 bar) (do not
pressurize more than 4.0 MPa (40 bar)). If the pressure does not
drop within 24 hours, the system passes the test. If the pressure
drops, check where the nitrogen leaks from.

Vacuum drying: Use a vacuum pump which can evacuate to 
–100.7 kPa (5 Torr, –755 mm Hg)

1.

Evacuate the system from the liquid and gas pipes by using a
vacuum pump for more than 2 hours and bring the system to 
–100.7 kPa. After keeping the system under that condition for
more than 1 hour, check if the vacuum gauge rises or not. If it
rises, the system may either contain moisture inside or have
leaks.

2.

Following should be executed if there is a possibility of moisture
remaining inside the pipe (if piping work is carried out during the
raining season or over a long period of time, rainwater may enter
the pipe during work).
After evacuating the system for 2 hours, pressurize the system
to 0.05 MPa (vacuum break) with nitrogen gas and evacuate the
system again using the vacuum pump for 1 hour to –100.7 kPa
(vacuum drying). If the system can not be evacuated to 
–100.7 kPa within 2 hours, repeat the operation of vacuum break
and vacuum drying.
Then, after leaving the system in vacuum for 1 hour, confirm that
the vacuum gauge does not rise.

8.

F

IELD

 

WIRING

1

Pressure reducing valve

2

Nitrogen

3

Measuring instrument

4

Tank (siphon system)

5

Vacuum pump

6

Charge hose

7

Service port for adding refrigerant

8

Liquid line stop valve

9

Gas line stop valve

10

Outdoor unit

11

To indoor unit

12

Stop valve service port

13

Dotted lines represent on site piping

14

Valve B

15

Valve C

16

Valve A

State 
of the valves A and B 
and the stop valve

Valve 

A

Valve 

B

Valve 

C

Liquid 

side 

stop 

valve

Gas 

side 

stop 

valve

Performing the 
airtightness test and 
vacuum drying
(Valve A must always be 
shut. Otherwise the 
refrigerant in the unit will 
pour out.)

Close

Open

Open

Close

Close

NOTE

Make sure to perform airtightness test
and vacuum drying using the service
ports of the stop valves of the liquid
side and of the gas side. (For the
service port location, refer to the
"Caution" label attached on the front
panel of the outdoor unit.)

See 

"11.3. Stop valve operation

procedure" on page 16

 for details on handling the

stop valve.

To prevent entry of any contamination and to
prevent insufficient pressure resistance, always
use the special tools dedicated for working with
R410A refrigerant.

NOTE

Make sure to use nitrogen gas. 

All field wiring and components must be installed by a
licensed electrician and must comply with relevant local
and national regulations.

The field wiring must be carried out in accordance with the
wiring diagrams and the instructions given below.

Be sure to use a dedicated power circuit. Never use a
power supply shared by another appliance. This can lead
to electric shock or fire.

Be sure to install an earth leakage circuit breaker.
(Because this unit uses an inverter, install an earth
leakage circuit breaker that is capable of handling high
harmonics in order to prevent malfunctioning of the earth
leakage breaker itself.)

Do not operate until refrigerant piping work is completed.
(If operated before completion of the piping work, the
compressor may break down.)

Never remove a thermistor, sensor, etc., when connecting
power wiring and transmission wiring.
(If operated without thermistor, sensor, etc., the
compressor may break down.)

The reversed phase protection detector of this product only
functions when the product starts up. Consequently,
reversed phase detection is not performed during normal
operation of the product.

The reversed phase protection detector is designed to stop
the product in the event of an abnormality when the
product is started up.

Replace two of the three phases (L1, L2, and L3) during
reverse-phase protection circuit operation.

If the possibility of reversed phase exists after a
momentary blackout and the power goes on and off while
the product is operating, attach a reversed phase
protection circuit locally. Running the product in reversed
phase can break the compressor and other parts.

Means for disconnection must be incorporated in the field
wiring in accordance with the wiring rules.
(An all-pole disconnection switch must be available on the
unit.)

Summary of Contents for VRVIII RXYQ8P7W1BR1

Page 1: ...VRVIII System air conditioner INSTALLATION MANUAL RXYQ8P7W1BR1 RXYQ10P7W1BR1 RXYQ12P7W1BR1 RXYQ14P7W1BR1 RXYQ16P7W1BR1 RXYQ18P7W1BR1 System air conditioner...

Page 2: ...mm d 500 mm a 50 mm b 100 mm c 50 mm d 500 mm a 200 mm b 300 mm a 10 mm b 300 mm c 10 mm d 500 mm e 20 mm a 50 mm b 100 mm c 50 mm d 500 mm e 100 mm a 200 mm b 300 mm e 400 mm A B C D A B 3 a 10 mm b...

Page 3: ...MULTI UNIT A1P 3 8 3 4 1 5 5 2 2 TO IN D UNIT F1 F2 DS1 1 2 3 4 OFF ON O U T I N F1 F2 P1 P2 A B C A B C 1 DS1 1 2 3 4 OFF ON O U T I N P1 P2 1 2 3 6 5 7 8 9 10 11 1 A 4 4 2 2 2 5 6 3 2 3 1 4 5 6 7 1...

Page 4: ...mukaisesti 14 za p edpokladu e jsou vyu v ny v souladu s na imi pokyny odpov daj n sleduj c m norm m nebo normativn m dokument m 15 u skladu sa slijede im standardom ima ili drugim normativnim dokume...

Page 5: ...pie aujam temperat ra TS TSmin Minim l temperat ra zem spiediena pus L C TSmax Pies tin t temperat ra saska ar maksim lo pie aujamo spiedienu PS M C Dzesin t js N Spiediena dro bas ier ces iestat ana...

Page 6: ...nominal heating capacities ranging from 16 0 to 56 5 kW The RXYQ P7 units can be combined with Daikin indoor units for air conditioning purposes and suitable for R410A The present installation manual...

Page 7: ...6 RXYQ18 360 585 29 NOTE The table above shows the possible total capacity and number of possible indoor units If the total capacity of the connected indoor units exceeds the capacity of the outdoor u...

Page 8: ...re Make sure to provide for adequate measures in order to prevent that the outdoor unit be used as a shelter by small animals Small animals making contact with electrical parts can cause malfunctions...

Page 9: ...urn valve which can evacuate to 100 7 kPa 5 Torr 755 mm Hg 1 Packaging material 2 Opening large 3 Belt sling 4 Opening small 40x45 5 Protector NOTE Use a belt sling of 20 mm wide that adequately bears...

Page 10: ...o mm pipes eld supply 6 3 Pipe connection Be sure to perform a nitrogen blow when brazing and to read the paragraph Caution to be taken when brazing refrigerant piping on page 4 rst 6 4 Connecting the...

Page 11: ...til all oil is dripped out 7 Cut the pinched piping off with a pipe cutter just above the brazing point or just above the marking in case there is no brazing point Never remove the pinched piping by b...

Page 12: ...on page 8 6 5 Protection against contamination when installing pipes Take measures to prevent foreign materials like moisture and contamination from mixing into the system Great caution is needed whe...

Page 13: ...een outdoor and BP units H2 40 m Between BP and BP units Difference in height Difference in height between BP and BP units H3 15 m Between indoor and indoor units Difference in height Difference in he...

Page 14: ...290 22 2 290 x 420 28 6 12 7 420 x 585 15 9 Between refrigerant branch kit and BP unit Pipe size for direct connection to BP unit must be based on the total capacity of the connected indoor units c d...

Page 15: ...side stop valve Gas side stop valve Performing the airtightness test and vacuum drying Valve A must always be shut Otherwise the refrigerant in the unit will pour out Close Open Open Close Close NOTE...

Page 16: ...mistor discharge M1C M3C R50 R59 Resistor R95 Resistor current limiting S1NPH Pressure sensor high S1NPL Pressure sensor low S1PH S3PH Pressure switch high T1A Current sensor A6P A7P SD1 Safety device...

Page 17: ...ential in the grounding This unit uses an inverter and therefore generates noise which will have to be reduced to avoid interfering with other devices The outer casing of the product may take on an el...

Page 18: ...the electric box lid 2 Transmission wiring 3 Pipe opening 4 Conduit 5 Power wiring and ground wiring 6 Cut off the shaded zones before use 7 Through cover 1 Knockout hole 2 Burr 3 If there are any po...

Page 19: ...res 3 core wire cables are allowable for the cooler heater changeover remote controller only Be sure to keep the power line and transmission line apart from each other Be careful about polarity of the...

Page 20: ...OL HEAT selector etc Precautions when laying power wiring Do not connect wiring of different thicknesses to the power terminal block Slack in the power wiring may cause abnormal heat When connecting w...

Page 21: ...t may only be charged after performing the leak test and the vacuum drying For factory charge refer to the unit name plate NOTE National implementation of EU regulation on certain uorinated greenhouse...

Page 22: ...ure after the unit has stopped Electric shock warning Close the electric box lid before turning on the main power Perform the settings on the circuit board A1P of the outdoor unit and check the LED di...

Page 23: ...ED display is shown open valve A and close the frontpanel If the frontpanel is left open the system can not operate properly during the refrigerant charging The state of this LED is not important 9 Co...

Page 24: ...st minute x c x x x x w Start up control for the next 2 minutes x c x x x w x Waiting for stable heating conditions for the next 15 minutes according to the system x c x x x w w H1P H2P H3P H4P H5P H6...

Page 25: ...such as a ball point pen to avoid touching live parts Make sure to re attach the inspection cover 1 into the switch box cover 2 after the job is nished WARNING ELECTRIC SHOCK Caution when performing s...

Page 26: ...ton and adjust the LED indication to the settings as shown below in the eld marked 2 Push the button and the setting is de ned 1 LED H1 8P 2 Push button switches BS1 BS5 3 Dip switch 1 DS1 1 4 4 Dip s...

Page 27: ...n of low noise operation state x standard operation factory setting w operation 4 Indication of power consumption limitation setting x standard operation factory setting w operation Possible functions...

Page 28: ...1 Close all front panels except the front panel of the electric box 2 Turn ON the power to all outdoor units and the connected indoor units Be sure to turn on the power 6 hours before operation in ord...

Page 29: ...um concentration level of refrigerant gas is not exceeded in the unlikely event of major leak in the system and this in accordance to the local applicable regulations and standards Maximum concentrati...

Page 30: ...ssary to revise the system Please consult your supplier 15 DISPOSAL REQUIREMENTS Dismantling of the unit treatment of the refrigerant of oil and of other parts must be done in accordance with relevant...

Page 31: ...26 12 13 14 15 16 5 1 7 10 3 2 9 6 6 6 6 7 4 11 8 6 6 6 6 6 6 7 7 9 8 4 11 6 6 1 10 3 2 6 6 6 6 27 2 1 1 1 2 3 4 4 3N 50 Hz 1 50 Hz 26 27...

Page 32: ...4PW44039 1E 07 2010 Copyright 2008 Daikin...

Reviews: