background image

RXYQ8~18P7W1BR1
VRVIII System air conditioner
4PW44039-1E – 07.2010

Installation manual

6

2

Removing the pinched piping 

(See figure 7)

See 

figure 7

.

3

Outdoor unit installed

(See figure 6)

Front connection:
Remove the stop valve cover to connect.

Bottom connection:
Remove the knock holes on the bottom frame and route the
piping under the bottom frame.

Processing the gas side accessory pipe (2)
Only in case of connecting at lateral side, cut the gas side
accessory pipe (2) as shown in 

figure 12

.

Never remove the pinched piping by brazing.

Any gas or oil remaining inside the stop valve may blow off
the pinched piping.

Failure to observe the instructions in procedure below
properly may result in property damage or personal injury,
which may be serious depending on the circumstances.

Use the following procedure to remove the pinched piping:

1

Remove the valve lid and make sure
that the stop valves are fully closed.

2

Connect a charge hose to service ports of all stop
valves.

3

Recover gas and oil from the pinched piping by
using a recovery unit.

Do not vent gases into the atmosphere.

4

When all gas and oil is recovered from the pinched
piping, disconnect the charge hose and close the
service ports.

5

In case the pinched piping lower part looks like
detail  

in 

figure 7

, follow instructions as per

procedure steps 7+8.

In case the pinched piping lower part looks like
detail  

in 

figure 7

, follow instructions as per

procedure steps 6+7+8.

6

Cut off the lower part of the smaller pinched
piping with an appropriate tool (e.g. a pipe
cutter, a pair of nippers, ...) so that a cross-
section is open, allowing remaining oil to
drip out in case the recovery was not complete.

Wait until all oil is dripped out.

7

Cut the pinched piping off with a pipe cutter just
above the brazing point or just above the marking in
case there is no brazing point.

Never remove the pinched
piping by brazing.

8

Wait until all oil is dripped out in case the recovery
was not complete, and only then proceed with
connection of the field piping.

1

Service port

2

Stop valve

3

Point of pipe cutting just above brazing point or above marking

A

Pinched piping 

B

Pinched piping 

A

B

Precautions when connecting field piping.

Perform brazing at the gas stop valve before
brazing at the liquid stop valve.

Add brazing material as shown in the figure.

Be sure to use the supplied accessory pipes
when carrying out piping work in the field.

Be sure that the field installed piping does not
touch other pipes, the bottom panel or side
panel. Especially for the bottom and side
connection, be sure to protect the piping with
suitable insulation, to prevent it from coming into
contact with the casing.

A

Front connection
Remove the stop valve cover to connect.

B

Bottom connection:
Remove the knock holes on the bottom frame and route the piping 
under the bottom frame

1

Gas pipe stop valve

2

Liquid pipe stop valve

3

Service port for adding refrigerant

4

Gas side accessory pipe (1)

5

Gas side accessory pipe (2)

6

Liquid side accessory pipe (1)

7

Liquid side accessory pipe (2)

8

Brazing

9

Gas side piping (field supply)

10

Liquid side piping (field supply)

11

Punch the knockout holes (use a hammer)

1

Gas side accessory pipe

2

Cutting location

3

Gas side piping (field supply)

4

Base

Unit type

A

B

C

D

8 Hp

(mm)

156

17

188

247

10 Hp

(mm)

156

23

192

247

12 Hp

(mm)

150

29

192

247

14~18 Hp

(mm)

150

29

192

251

NOTE

When connecting the piping on site, be sure to
use the accessory piping.

Make sure the onsite piping does not come into
contact with other piping, the bottom frame or side
panels of the unit.

Summary of Contents for VRVIII RXYQ10P7W1BR1

Page 1: ...VRVIII System air conditioner INSTALLATION MANUAL RXYQ8P7W1BR1 RXYQ10P7W1BR1 RXYQ12P7W1BR1 RXYQ14P7W1BR1 RXYQ16P7W1BR1 RXYQ18P7W1BR1 System air conditioner...

Page 2: ...mm d 500 mm a 50 mm b 100 mm c 50 mm d 500 mm a 200 mm b 300 mm a 10 mm b 300 mm c 10 mm d 500 mm e 20 mm a 50 mm b 100 mm c 50 mm d 500 mm e 100 mm a 200 mm b 300 mm e 400 mm A B C D A B 3 a 10 mm b...

Page 3: ...MULTI UNIT A1P 3 8 3 4 1 5 5 2 2 TO IN D UNIT F1 F2 DS1 1 2 3 4 OFF ON O U T I N F1 F2 P1 P2 A B C A B C 1 DS1 1 2 3 4 OFF ON O U T I N P1 P2 1 2 3 6 5 7 8 9 10 11 1 A 4 4 2 2 2 5 6 3 2 3 1 4 5 6 7 1...

Page 4: ...mukaisesti 14 za p edpokladu e jsou vyu v ny v souladu s na imi pokyny odpov daj n sleduj c m norm m nebo normativn m dokument m 15 u skladu sa slijede im standardom ima ili drugim normativnim dokume...

Page 5: ...pie aujam temperat ra TS TSmin Minim l temperat ra zem spiediena pus L C TSmax Pies tin t temperat ra saska ar maksim lo pie aujamo spiedienu PS M C Dzesin t js N Spiediena dro bas ier ces iestat ana...

Page 6: ...nominal heating capacities ranging from 16 0 to 56 5 kW The RXYQ P7 units can be combined with Daikin indoor units for air conditioning purposes and suitable for R410A The present installation manual...

Page 7: ...6 RXYQ18 360 585 29 NOTE The table above shows the possible total capacity and number of possible indoor units If the total capacity of the connected indoor units exceeds the capacity of the outdoor u...

Page 8: ...re Make sure to provide for adequate measures in order to prevent that the outdoor unit be used as a shelter by small animals Small animals making contact with electrical parts can cause malfunctions...

Page 9: ...urn valve which can evacuate to 100 7 kPa 5 Torr 755 mm Hg 1 Packaging material 2 Opening large 3 Belt sling 4 Opening small 40x45 5 Protector NOTE Use a belt sling of 20 mm wide that adequately bears...

Page 10: ...o mm pipes eld supply 6 3 Pipe connection Be sure to perform a nitrogen blow when brazing and to read the paragraph Caution to be taken when brazing refrigerant piping on page 4 rst 6 4 Connecting the...

Page 11: ...til all oil is dripped out 7 Cut the pinched piping off with a pipe cutter just above the brazing point or just above the marking in case there is no brazing point Never remove the pinched piping by b...

Page 12: ...on page 8 6 5 Protection against contamination when installing pipes Take measures to prevent foreign materials like moisture and contamination from mixing into the system Great caution is needed whe...

Page 13: ...een outdoor and BP units H2 40 m Between BP and BP units Difference in height Difference in height between BP and BP units H3 15 m Between indoor and indoor units Difference in height Difference in he...

Page 14: ...290 22 2 290 x 420 28 6 12 7 420 x 585 15 9 Between refrigerant branch kit and BP unit Pipe size for direct connection to BP unit must be based on the total capacity of the connected indoor units c d...

Page 15: ...side stop valve Gas side stop valve Performing the airtightness test and vacuum drying Valve A must always be shut Otherwise the refrigerant in the unit will pour out Close Open Open Close Close NOTE...

Page 16: ...mistor discharge M1C M3C R50 R59 Resistor R95 Resistor current limiting S1NPH Pressure sensor high S1NPL Pressure sensor low S1PH S3PH Pressure switch high T1A Current sensor A6P A7P SD1 Safety device...

Page 17: ...ential in the grounding This unit uses an inverter and therefore generates noise which will have to be reduced to avoid interfering with other devices The outer casing of the product may take on an el...

Page 18: ...the electric box lid 2 Transmission wiring 3 Pipe opening 4 Conduit 5 Power wiring and ground wiring 6 Cut off the shaded zones before use 7 Through cover 1 Knockout hole 2 Burr 3 If there are any po...

Page 19: ...res 3 core wire cables are allowable for the cooler heater changeover remote controller only Be sure to keep the power line and transmission line apart from each other Be careful about polarity of the...

Page 20: ...OL HEAT selector etc Precautions when laying power wiring Do not connect wiring of different thicknesses to the power terminal block Slack in the power wiring may cause abnormal heat When connecting w...

Page 21: ...t may only be charged after performing the leak test and the vacuum drying For factory charge refer to the unit name plate NOTE National implementation of EU regulation on certain uorinated greenhouse...

Page 22: ...ure after the unit has stopped Electric shock warning Close the electric box lid before turning on the main power Perform the settings on the circuit board A1P of the outdoor unit and check the LED di...

Page 23: ...ED display is shown open valve A and close the frontpanel If the frontpanel is left open the system can not operate properly during the refrigerant charging The state of this LED is not important 9 Co...

Page 24: ...st minute x c x x x x w Start up control for the next 2 minutes x c x x x w x Waiting for stable heating conditions for the next 15 minutes according to the system x c x x x w w H1P H2P H3P H4P H5P H6...

Page 25: ...such as a ball point pen to avoid touching live parts Make sure to re attach the inspection cover 1 into the switch box cover 2 after the job is nished WARNING ELECTRIC SHOCK Caution when performing s...

Page 26: ...ton and adjust the LED indication to the settings as shown below in the eld marked 2 Push the button and the setting is de ned 1 LED H1 8P 2 Push button switches BS1 BS5 3 Dip switch 1 DS1 1 4 4 Dip s...

Page 27: ...n of low noise operation state x standard operation factory setting w operation 4 Indication of power consumption limitation setting x standard operation factory setting w operation Possible functions...

Page 28: ...1 Close all front panels except the front panel of the electric box 2 Turn ON the power to all outdoor units and the connected indoor units Be sure to turn on the power 6 hours before operation in ord...

Page 29: ...um concentration level of refrigerant gas is not exceeded in the unlikely event of major leak in the system and this in accordance to the local applicable regulations and standards Maximum concentrati...

Page 30: ...ssary to revise the system Please consult your supplier 15 DISPOSAL REQUIREMENTS Dismantling of the unit treatment of the refrigerant of oil and of other parts must be done in accordance with relevant...

Page 31: ...26 12 13 14 15 16 5 1 7 10 3 2 9 6 6 6 6 7 4 11 8 6 6 6 6 6 6 7 7 9 8 4 11 6 6 1 10 3 2 6 6 6 6 27 2 1 1 1 2 3 4 4 3N 50 Hz 1 50 Hz 26 27...

Page 32: ...4PW44039 1E 07 2010 Copyright 2008 Daikin...

Reviews: