background image

Installation manual

13

RXYQ8~18P7W1BR1

VRVIII System air conditioner

4PW44039-1E – 07.2010

8.5.

System examples

(See figure 17)

8.6.

Leading power line and transmission line

Be sure to let the power line and the transmission line pass
through a conduit hole.

Lead the power line from the upper hole on the left side plate,
from the front position of the main unit (through the conduit hole
of the wiring mounting plate) or from a knock out hole to be
made in the unit's bottom plate. 

(See figure 19)

Precautions when knocking out knockout holes

To punch a knockout hole, hit on it with a hammer.

After knocking out the holes, we recommend you paint the
edges and areas around the edges using the repair paint to
prevent rusting.

When passing electrical wiring through the knockout holes,
remove any burrs from the knockout hole edges. Wrap the wiring
with protective tape in order to prevent damage to the wires, put
the wires through field supplied protective wire conduits at that
location, or install suitable field supplied wire nipples or rubber
bushings into the knockout holes.

8.7.

Field line connection: transmission wiring and 
cool/heat selection

Connection diagram 

(See figure 18)

Fixing transmission wiring 

(See figure 22)

Inside switchbox

1

Field power supply

2

Main switch

3

Earth leakage breaker

4

Earth

5

BP unit

Power supply wiring (sheathed cable) (230 V)

Power supply wiring (sheathed cable) (400 V)

Transmission wiring (sheathed cable) (16 V)

Power transmission wiring for indoor units

1

Electric wiring diagram. Printed on the back of the electric box lid.

2

Transmission wiring

3

Pipe opening

4

Conduit

5

Power wiring and ground wiring

6

Cut off the shaded zones before use.

7

Through cover

1

Knockout hole

2

Burr

3

If there are any possibilities that small animals enter the system 
through the knockout holes, plug the holes with packing materials 
(to be prepared on-site).

2

3

1

Use a power wire pipe for the power wiring.

Outside the unit, make sure the weak low voltage
electric wiring (i.e. for the remote control, between
units, etc.) and the high voltage electric wiring do not
pass near each other, keeping them at least 50 mm
apart. Proximity may cause electrical interference,
malfunctions, and breakage.

Be sure to connect the power wiring to the power
wiring terminal block and secure it as described under

"8.8. Field line connection: power wiring" on page 14

.

Inter-unit wiring should be secured as described in

"8.7. Field line connection: transmission wiring and
cool/heat selection" on page 13

.

Secure the wiring with the accessory clamps so
that it does not touch the piping and no external
force can be applied to the terminal.

Make sure the wiring and the electric box lid do not
stick up above the structure, and close the cover
firmly.

1

Cool/heat selector

2

Outdoor unit PC board (A1P)

3

Take care of the polarity

4

Use the conductor of sheathed wire (2 wire) (no polarity)

5

Terminal board (field supply)

6

BP unit

7

Outdoor unit

8

Indoor unit

1

Heating/cooling switching remote control cord (when a heating/
cooling switch remote control (optional) is connected) (ABC)

2

Fix to the indicated plastic brackets using field supplied clamping 
material.

3

Wiring between the units (Outdoor - outdoor) (F1+F2 right)

4

Wiring between the units (BP - outdoor) (F1+F2 left)

5

Plastic bracket

Summary of Contents for VRVIII RXYQ10P7W1BR1

Page 1: ...VRVIII System air conditioner INSTALLATION MANUAL RXYQ8P7W1BR1 RXYQ10P7W1BR1 RXYQ12P7W1BR1 RXYQ14P7W1BR1 RXYQ16P7W1BR1 RXYQ18P7W1BR1 System air conditioner...

Page 2: ...mm d 500 mm a 50 mm b 100 mm c 50 mm d 500 mm a 200 mm b 300 mm a 10 mm b 300 mm c 10 mm d 500 mm e 20 mm a 50 mm b 100 mm c 50 mm d 500 mm e 100 mm a 200 mm b 300 mm e 400 mm A B C D A B 3 a 10 mm b...

Page 3: ...MULTI UNIT A1P 3 8 3 4 1 5 5 2 2 TO IN D UNIT F1 F2 DS1 1 2 3 4 OFF ON O U T I N F1 F2 P1 P2 A B C A B C 1 DS1 1 2 3 4 OFF ON O U T I N P1 P2 1 2 3 6 5 7 8 9 10 11 1 A 4 4 2 2 2 5 6 3 2 3 1 4 5 6 7 1...

Page 4: ...mukaisesti 14 za p edpokladu e jsou vyu v ny v souladu s na imi pokyny odpov daj n sleduj c m norm m nebo normativn m dokument m 15 u skladu sa slijede im standardom ima ili drugim normativnim dokume...

Page 5: ...pie aujam temperat ra TS TSmin Minim l temperat ra zem spiediena pus L C TSmax Pies tin t temperat ra saska ar maksim lo pie aujamo spiedienu PS M C Dzesin t js N Spiediena dro bas ier ces iestat ana...

Page 6: ...nominal heating capacities ranging from 16 0 to 56 5 kW The RXYQ P7 units can be combined with Daikin indoor units for air conditioning purposes and suitable for R410A The present installation manual...

Page 7: ...6 RXYQ18 360 585 29 NOTE The table above shows the possible total capacity and number of possible indoor units If the total capacity of the connected indoor units exceeds the capacity of the outdoor u...

Page 8: ...re Make sure to provide for adequate measures in order to prevent that the outdoor unit be used as a shelter by small animals Small animals making contact with electrical parts can cause malfunctions...

Page 9: ...urn valve which can evacuate to 100 7 kPa 5 Torr 755 mm Hg 1 Packaging material 2 Opening large 3 Belt sling 4 Opening small 40x45 5 Protector NOTE Use a belt sling of 20 mm wide that adequately bears...

Page 10: ...o mm pipes eld supply 6 3 Pipe connection Be sure to perform a nitrogen blow when brazing and to read the paragraph Caution to be taken when brazing refrigerant piping on page 4 rst 6 4 Connecting the...

Page 11: ...til all oil is dripped out 7 Cut the pinched piping off with a pipe cutter just above the brazing point or just above the marking in case there is no brazing point Never remove the pinched piping by b...

Page 12: ...on page 8 6 5 Protection against contamination when installing pipes Take measures to prevent foreign materials like moisture and contamination from mixing into the system Great caution is needed whe...

Page 13: ...een outdoor and BP units H2 40 m Between BP and BP units Difference in height Difference in height between BP and BP units H3 15 m Between indoor and indoor units Difference in height Difference in he...

Page 14: ...290 22 2 290 x 420 28 6 12 7 420 x 585 15 9 Between refrigerant branch kit and BP unit Pipe size for direct connection to BP unit must be based on the total capacity of the connected indoor units c d...

Page 15: ...side stop valve Gas side stop valve Performing the airtightness test and vacuum drying Valve A must always be shut Otherwise the refrigerant in the unit will pour out Close Open Open Close Close NOTE...

Page 16: ...mistor discharge M1C M3C R50 R59 Resistor R95 Resistor current limiting S1NPH Pressure sensor high S1NPL Pressure sensor low S1PH S3PH Pressure switch high T1A Current sensor A6P A7P SD1 Safety device...

Page 17: ...ential in the grounding This unit uses an inverter and therefore generates noise which will have to be reduced to avoid interfering with other devices The outer casing of the product may take on an el...

Page 18: ...the electric box lid 2 Transmission wiring 3 Pipe opening 4 Conduit 5 Power wiring and ground wiring 6 Cut off the shaded zones before use 7 Through cover 1 Knockout hole 2 Burr 3 If there are any po...

Page 19: ...res 3 core wire cables are allowable for the cooler heater changeover remote controller only Be sure to keep the power line and transmission line apart from each other Be careful about polarity of the...

Page 20: ...OL HEAT selector etc Precautions when laying power wiring Do not connect wiring of different thicknesses to the power terminal block Slack in the power wiring may cause abnormal heat When connecting w...

Page 21: ...t may only be charged after performing the leak test and the vacuum drying For factory charge refer to the unit name plate NOTE National implementation of EU regulation on certain uorinated greenhouse...

Page 22: ...ure after the unit has stopped Electric shock warning Close the electric box lid before turning on the main power Perform the settings on the circuit board A1P of the outdoor unit and check the LED di...

Page 23: ...ED display is shown open valve A and close the frontpanel If the frontpanel is left open the system can not operate properly during the refrigerant charging The state of this LED is not important 9 Co...

Page 24: ...st minute x c x x x x w Start up control for the next 2 minutes x c x x x w x Waiting for stable heating conditions for the next 15 minutes according to the system x c x x x w w H1P H2P H3P H4P H5P H6...

Page 25: ...such as a ball point pen to avoid touching live parts Make sure to re attach the inspection cover 1 into the switch box cover 2 after the job is nished WARNING ELECTRIC SHOCK Caution when performing s...

Page 26: ...ton and adjust the LED indication to the settings as shown below in the eld marked 2 Push the button and the setting is de ned 1 LED H1 8P 2 Push button switches BS1 BS5 3 Dip switch 1 DS1 1 4 4 Dip s...

Page 27: ...n of low noise operation state x standard operation factory setting w operation 4 Indication of power consumption limitation setting x standard operation factory setting w operation Possible functions...

Page 28: ...1 Close all front panels except the front panel of the electric box 2 Turn ON the power to all outdoor units and the connected indoor units Be sure to turn on the power 6 hours before operation in ord...

Page 29: ...um concentration level of refrigerant gas is not exceeded in the unlikely event of major leak in the system and this in accordance to the local applicable regulations and standards Maximum concentrati...

Page 30: ...ssary to revise the system Please consult your supplier 15 DISPOSAL REQUIREMENTS Dismantling of the unit treatment of the refrigerant of oil and of other parts must be done in accordance with relevant...

Page 31: ...26 12 13 14 15 16 5 1 7 10 3 2 9 6 6 6 6 7 4 11 8 6 6 6 6 6 6 7 7 9 8 4 11 6 6 1 10 3 2 6 6 6 6 27 2 1 1 1 2 3 4 4 3N 50 Hz 1 50 Hz 26 27...

Page 32: ...4PW44039 1E 07 2010 Copyright 2008 Daikin...

Reviews: