![background image](http://html1.mh-extra.com/html/daikin/vrv-wii-fxycp30my1/vrv-wii-fxycp30my1_installation-procedure_4705241020.webp)
• VRV
®
Systems • Installation procedure
19
• Installation procedure
1
Installation of outdoor
1 - 7 Field wiring
1 - 7 - 4
Examples
햲
Intake for power supply wiring, pump operation output (high voltage) and ground wiring.
햳
Intake for power supply jumper wiring and ground jumper wiring. (Only for jumping the power supply.)
햴
Stop valve for discharge gas (high temperature part)
햵
Retain the power supply wiring, pump operation output (high voltage) and ground wiring with the accessory clamp(A).
햶
Insert the accessory clamp (B) in the hole of the fixing plate for stop valve.
햷
Power supply wiring, pump operation output (high voltage) and ground wiring.
햸
Approximately 50mm
햹
Power supply jumper wiring and ground jumper wiring.
햺
Retain the power supply wiring, pump operation output (high voltage) and ground wiring with the accessory clamp (B) to prevent them from
touching with the stop valve for discharge gas.
햻
Use the through hole cover for power jumper supply by cutting the hatched area.
햽
Hatched area
햾
Insert the accessory clamp (B) in the hole of the bottom of electrical box.
햿
Intake for transmission wiring. (low voltage)
헀
Make the transmission wiring have a trap with looseness to prevent condensate from reaching the top of electrical box.
헁
Fix the transmission wiring to resin clamps with the accessory clamps (A)
헂
Pass the transmission wiring (low voltage) through the wire clip.
헃
Retain the power supply wiring, pump operation output (high voltage) and ground wiring to the bottom of electrical box with the accessory
clamp (B)
헄
Do not bundle the power supply jumper wiring.