8 Commissioning

Installation manual 

41

RWEQ96~432TAYCU 

VRV W T-Series water-cooled system air conditioner 

4P540122-1B – 2018.11

Error code (Auto 

backup possible)

Error contents

H9

Outside unit inside air thermistor (R1T) abnormality

HC

Water inlet thermistor (R9T) abnormality
Water outlet thermistor (R10T) abnormality

J3

Discharge pipe thermistor (R12T) abnormality

Compressor body thermistor (R13T) abnormality

J4

Plate heat exchanger gas thermistor (R4T) 

abnormality

J5

Suction pipe thermistor (R3T) abnormality

J6

Plate heat exchanger liquid thermistor (R7T) 

abnormality

J7

Receiver outlet liquid pipe thermistor (R6T) 

abnormality

Subcooling heat exchanger outlet liquid pipe 

thermistor (R8T) abnormality

Injection pipe thermistor (R11T) abnormality

J9

Subcooling heat exchanger outlet gas pipe 

thermistor (R5T) abnormality

Exhaust heat cancellation heat exchanger gas 

pipe thermistor (R2T) abnormality

JA

High pressure sensor abnormality

JC

Low pressure sensor abnormality

L1

Inverter PCB abnormality

L3

Reactor temperature rise abnormality

L4

Inverter radiation fin temperature rise abnormality

L5

Inverter compressor instantaneous overcurrent

L8

Inverter compressor overcurrent

L9

Inverter compressor startup abnormality

LC

Transmission error between inverter PCB and 

outside unit main PCB

7 .2 .9

To connect the PC configurator to the 

outside unit

X27A

a

b

c

2

3

4

5

H J

ST

X27A

A1P

a

PC

b

Cable (999482P3)

c

Outside unit main PCB

8

Commissioning

8 .1

Overview: Commissioning

After installation and once the field settings are defined, the installer 

is obliged to verify correct operation. Therefore a test run must be 

performed according to the procedures described below.
This chapter describes what you have to do and know to 

commission the system after it is configured.
Commissioning typically consists of the following stages:
1  Checking the "Checklist before commissioning".
2  Performing a test run.
3  If necessary, correcting errors after abnormal completion of the 

test run.

4  Operating the system.

8 .2

Precautions when commissioning

DANGER: RISK OF ELECTROCUTION 

DANGER: RISK OF BURNING 

CAUTION 
Do not perform the test operation while working on the 

indoor units .

 

When performing the test operation, not only the outside 

unit, but the connected indoor unit will operate as well. 

Working on an indoor unit while performing a test operation 

is dangerous.

CAUTION 

Do not insert fingers, rods or other objects into the air inlet 

or outlet. Do not remove the fan guard. When the fan is 

rotating at high speed, it will cause injury.

INFORMATION 

During the first running period of the unit, the required 

power may be higher than stated on the nameplate of the 

unit. This phenomenon is caused by the compressor, that 

needs a continuous run time of 50 hours before reaching 

smooth operation and stable power consumption.

NOTE 

Be sure to turn on the power 6 hours before operation in 

order to have power running to the crankcase heater and 

to protect the compressor.

During test operation, the outside unit and the indoor units will start 

up. Make sure that the preparations of all indoor units are finished 

(field piping, electrical wiring, air purge, ...). See installation manual 

of the indoor units for details.

8 .3

Checklist before commissioning

After the installation of the unit, first check the following items. Once 

all below checks are fulfilled, the unit must be closed, only then can 

the unit be powered up.

You read the complete installation and operation 

instructions, as described in the 

installation manual

.

Installation

 

Check that the unit is properly installed, to avoid abnormal 

noises and vibrations when starting up the unit.