background image

15 Electrical installation

Installation and operation manual

28

RWEYQ8~14T9Y1B

VRV IV water-cooled system air conditioner

4P452190-1D – 2020.10

NOTICE

Applicable  legislation  on 

fluorinated  greenhouse  gases

requires  that  the  refrigerant  charge  of  the  unit  is  indicated
both in weight and CO

2

 equivalent.

Formula  to  calculate  the  quantity  in  CO

2

  equivalent

tonnes:

  GWP  value  of  the  refrigerant  ×  total  refrigerant

charge [in kg] / 1000

Use  the  GWP  value  mentioned  on  the  refrigerant  charge
label.

2

Fix the label on the inside of the outdoor unit near the gas and
liquid stop valves.

14.6

Connecting water piping

14.6.1

About connecting the water piping

Before connecting the water piping

Make sure the outdoor and indoor units are mounted.

Typical workflow

Connecting  the  water  piping  typically  consists  of  the  following
stages:

1

Connecting the water piping of the outdoor unit.

2

Filling the water circuit.

3

Insulating the water piping.

14.6.2

To connect the water piping

a

b

a

Cooling water outlet

b

Cooling water inlet

Consult 

"14.2.1  Water  circuit  requirements"

  [

4

  19]  for  the  correct

tightening torque of the water piping connections.

14.6.3

To fill the water circuit

1

Connect the water supply hose to the fill valve (field supply).

2

Open the fill valve.

3

Run  the  pump  ONLY  and  make  sure  that  no  air  has  been
caught in the water circulation system otherwise the plate heat
exchanger will freeze.

4

Check if the water flow rate is correct, otherwise the plate heat
exchanger will freeze. Measure any water pressure loss before
and after running the pump and make sure that the flow rate is
correct.  If  not,  stop  the  pump  immediately  and  carry  out
troubleshooting.

14.6.4

To insulate the water piping

The  outdoor  water  piping  MUST  be  insulated  to  prevent
condensation during heating operation or to protect against freezing
at cold ambient temperatures.

See 

"14.2.1 Water circuit requirements"

 [

4

 19] for more information.

15

Electrical installation

DANGER: RISK OF ELECTROCUTION

WARNING

ALWAYS use multicore cable for power supply cables.

15.1

Safety device requirements

The  power  supply  must  be  protected  with  the  required  safety
devices, i.e. a main switch, a slow blow fuse on each phase and an
earth leakage protector in accordance with the applicable legislation.

For standard combinations

Selection and sizing of the wiring should be done in accordance with
the applicable legislation based on the information mentioned in the
table below.

Model

Minimum

circuit

ampacity

Recommended

fuses

RWEYQ8T9

15.5 A

20 A

RWEYQ10T9

16.4 A

20 A

RWEYQ12T9

19.4 A

25 A

RWEYQ14T9

22.3 A

25 A

RWEYQ16T9

31.0 A

32 A

RWEYQ18T9

31.9 A

32 A

RWEYQ20T9

32.7 A

35 A

RWEYQ22T9

35.8 A

40 A

RWEYQ24T9

38.9 A

40 A

RWEYQ26T9

41.7 A

50 A

RWEYQ28T9

44.6 A

50 A

RWEYQ30T9

49.1 A

50 A

RWEYQ32T9

52.2 A

63 A

RWEYQ34T9

55.3 A

63 A

RWEYQ36T9

58.3 A

63 A

RWEYQ38T9

61.2 A

63 A

RWEYQ40T9

64.0 A

80 A

RWEYQ42T9

66.9 A

80 A

For all models:

▪ Phase and frequency: 3N~ 50 Hz

▪ Voltage: 380~415 V

▪ Transmission  line  section:  0.75~1.25  mm

2

,  maximum  length  is

1000  m.  If  the  total  transmission  wiring  exceeds  these  limits,  it
may result in communication error.

For free combinations

Calculate the recommended fuse capacity.

Formula

Calculate, by adding the minimum circuit amps of each
used unit (according to the table above), multiply the
result by 1.1 and select the next higher recommended
fuse capacity.

Summary of Contents for VRV IV RWEYQ-T9

Page 1: ...lation and operation manual VRV IV water cooled system air conditioner English Installation and operation manual VRV IV water cooled system air conditioner RWEYQ8T9Y1B RWEYQ10T9Y1B RWEYQ12T9Y1B RWEYQ1...

Page 2: ...8 19 20 21 22 23 24 25 Directivelor cu amendamentele respective Direktive z vsemi spremembami Direktiivid koos muudatustega Direktyvose su papildymais Direkt v s un to papildin jumos Smernice v platno...

Page 3: ...S vastaava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplot...

Page 4: ...s not spin 13 8 2 15 Symptom The display shows 88 13 8 2 16 Symptom The compressor in the outdoor unit does not stop after a short heating operation 13 8 2 17 Symptom The inside of an outdoor unit is...

Page 5: ...r reference guide Preparation of the installation reference data Detailed step by step instructions and background information for basic and advanced usage Format Digital files on http www daikineurop...

Page 6: ...carrying wires are tautened before the earth wire is in case the power supply is pulled loose from the stress relief CAUTION Do NOT perform the test operation while working on the indoor units When pe...

Page 7: ...ation CAUTION NEVER touch the internal parts of the controller Do NOT remove the front panel Some parts inside are dangerous to touch and appliance problems may happen For checking and adjusting the i...

Page 8: ...ices ventilate the room and contact the dealer where you purchased the unit Do not use the system until a service person confirms that the portion where the refrigerant leaks is repaired 4 About the s...

Page 9: ...ch 6 hours before operation 6 2 2 About cooling heating fan only and automatic operation Changeover cannot be made with a user interface whose display shows change over under centralised control refer...

Page 10: ...humidity in your room with minimal temperature decrease minimal room cooling The micro computer automatically determines temperature and fan speed cannot be set by the user interface The system does...

Page 11: ...ing for damage If damaged the unit may fall and result in injury NOTICE Do NOT wipe the controller operation panel with benzine thinner chemical dust cloth etc The panel may get discoloured or the coa...

Page 12: ...unit manual Malfunction Measure The system operates but cooling or heating is insufficient Check if air inlet or outlet of outdoor or indoor unit is not blocked by obstacles Remove any obstacles and m...

Page 13: ...stop Operation automatically restarts when the noise ceases 8 2 9 Symptom Noise of air conditioners Indoor unit A zeen sound is heard immediately after the power supply is turned on The electronic ex...

Page 14: ...b Installation manual and operation manual c Additional refrigerant charge label d Installation information sticker e Fluorinated greenhouse gases label f Multilingual fluorinated greenhouse gases la...

Page 15: ...ratures from 21 C DB to 32 C DB or 14 C WB to 25 C WB The ambient temperature around the unit should be above 0 C DB and below 40 C DB Relative humidity around the unit should be below 80 The water te...

Page 16: ...l the water piping and field wiring front plate B has to be removed 13 2 2 To open the electrical component box of the outdoor unit NOTICE Do NOT apply excessive force when opening the electronic comp...

Page 17: ...ery Determine the proper size using the following tables and reference figure only for indication In case of heat pump system A B B B C D F G E x y b a 3 1 2 4 5 1 2 VRV DX indoor unit 3 Branch select...

Page 18: ...ed on the total capacity of the connected indoor units only in case RA DX indoor units are connected Total capacity index of connected indoor units Piping outer diameter size mm Gas pipe Liquid pipe 2...

Page 19: ...ll the following restriction conditions A B C a c b A B C a To indoor units b Outdoor unit multi connecting piping kit first branch c Outdoor unit multi connecting piping kit second branch 14 2 Prepar...

Page 20: ...on the piping between this shut off valve and the outdoor unit for cleaning by chemicals For cleaning and water draining of the outdoor unit long period of non use or during non use in winter install...

Page 21: ...the design flow rate calculated by the hydronic engineer when designing the building system Correct valve selection is done when following conditions are met B C AND E A D For further selection requir...

Page 22: ...ay enter the machine 14 3 6 Using the stop valve and service port To handle the stop valve Take the following guidelines into account Make sure to keep the appropriate stop valves open during operatio...

Page 23: ...nect the vacuuming recovery unit through a manifold to the service port of all stop valves p p R410A N2 b c e a f g h d A C 1 D B a Pressure reducing valve b Nitrogen c Weighing scales d Refrigerant R...

Page 24: ...ant piping for example water may have entered the piping first carry out the vacuum drying procedure below until all moisture has been removed All piping inside the unit has been factory tested for le...

Page 25: ...for 1 hour the system may contain too much moisture In that case break the vacuum by pressurising with nitrogen gas to a gauge pressure of 0 05 MPa 0 5 bar and repeat steps 1 to 3 until all moisture h...

Page 26: ...additional 0 5 kg of refrigerant per outdoor unit In case of heat recovery system Formula R X1 22 2 0 37 X2 19 1 0 26 X3 15 9 0 18 X4 12 7 0 12 X5 9 5 0 059 X6 6 4 0 022 1 04 A C R Additional refriger...

Page 27: ...ks to each outdoor unit NOTICE The refrigerant charging port is connected to the piping inside the unit The unit s internal piping is already factory charged with refrigerant so be careful when connec...

Page 28: ...flow rate is correct If not stop the pump immediately and carry out troubleshooting 14 6 4 To insulate the water piping The outdoor water piping MUST be insulated to prevent condensation during heatin...

Page 29: ...g In case of heat recovery system B i a b f c f e g d c h j j i a Field power supply with earth leakage protector b Main switch c Earth connection d Outdoor unit e Indoor unit f User interface g BS un...

Page 30: ...es using finishing tape as shown in figure below b a f c d f e f a Liquid pipe b Gas pipe c Finishing tape d High pressure low pressure gas pipe e Transmission wiring F1 F2 f Insulator 15 6 To route a...

Page 31: ...e closed valve Select a flow switch contact of at least 15 V DC 1 mA Connect the flow switch to X2M terminals 5 and 6 In case of a multi outdoor unit system install one or more flow switches depending...

Page 32: ...ng the current field setting value is possible In general normal operation can be resumed without special intervention after changing field settings Some field settings are used for special operation...

Page 33: ...atus of the unit What How Changing and accessing the setting in mode 1 Once mode 1 is selected push BS1 one time you can select the wanted setting It is done by pushing BS2 Accessing the selected sett...

Page 34: ...m 3 Each unit has a pump valve pump is OFF when slave unit does not operate Minimum water flow rate limit control To change the minimum water flow rate limit of the variable flow system change the set...

Page 35: ...tion Check that the unit is properly installed to avoid abnormal noises and vibrations when starting up the unit Field wiring Be sure that the field wiring has been carried out according to the instru...

Page 36: ...s 17 4 To perform a test run 1 Close all front panels in order to not let it be the cause of misjudgement except the electrical component box inspection opening service cover 2 Make sure all field set...

Page 37: ...site publicly accessible The full set of latest technical data is available on the Daikin Business Portal authentication required 19 1 Service space Outdoor unit Make sure the space around the unit is...

Page 38: ...pressor Double tube heat exchanger Liquid receiver Thermistor 20 Disposal NOTICE Do NOT try to dismantle the system yourself dismantling of the system treatment of the refrigerant oil and other parts...

Page 39: ......

Page 40: ...4P452190 1D 2020 10 Copyright 2017 Daikin 4P452190 1 D 0000000 Verantwortung f r Energie und Umwelt...

Reviews: