background image

English

11

6-6 PIPING INSULATION

• After the gas leak inspection is completed, refer to the following figures and use the included insulation tube 

3) and clamps 2) to apply the insulation.

NOTES

• Insulate all of the piping including the liquid pipes, HP/LP gas pipes, suction gas pipes, gas pipes, and the 

pipe connections for these. Not insulting these pipes could result in water leaks or burns. In particular, suc-
tion gas flows in the HP/LP gas pipes during full cooling operation, so the same amount of insulation as 
used for the suction gas pipes is required. In addition, high-pressure gas flows in the HP/LP gas pipes and 
gas pipes, so use insulation that can withstand more than 120˚C.

• When reinforcing the insulation material for the installation environment, also reinforce the insulation on the 

piping protruding from the unit and on the pipe connections. Locally purchase the insulation required for the 
reinforcement work.

Insulation Installation Precautions

1. Seal so that air cannot be in and out of the end.
2. Do not over tighten the clamp so as to maintain the insulation thickness.
3. Be sure to attach the insulation (field supply) with the seams facing up. 

(See figure at right.)

BSVQ100 · 160P type

BSVQ250P type

BS unit

BS unit

Clamp 2)-2 (Accessory)

Clamp 2)-2 (Accessory)

Insulation tube 3)-2
(Accessory)

Insulation 
tube 3)-2
(Accessory)

Insulation tube 3)-2
(Accessory)

Insulation 
tube 3)-1
(Accessory)

Insulation 
tube 3)-2
(Accessory)

Insulation 
tube 3)-1
(Accessory)

Insulation tube 3)-2
(Accessory)

Insulation tube 3)-1
(Accessory)

Insulation tube 3)-1
(Accessory)

Insulation tube 3)-3
(Accessory)

Suction gas pipe 
(Note 1)

Gas pipe 
(Note 1)

Liquid pipe

Gas pipe 
(Note 2)

Liquid pipe

HP/LP gas pipe 
(Note 1)

Liquid pipe

Suction gas pipe 
(Note 2)
HP/LP gas pipe 
(Note 1)

Liquid pipe

Clamp 2)-2 (Accessory)

Clamp 2)-2 (Accessory)

Insulation Attachment Instructions

Piping insulation
(Product piping side)

Pipe connection

Insulation material 
(Field supply)

Seal the connection.

Piping insulation
(Site piping side)

(1) Attach the included 

insulation.

(2) Seal

(3) Use the clamps (accessory) 

to hold both ends.

Note 1: For suction gas pipes, HP/LP gas 

pipes, and gas pipes, after 
attaching the included insulation 
tube, wrap more insulation (field 
supply) around the connections.

Note 2: For Model Q250, wrap sealing 

material (field supply) around the 
insulation tube 3)-2 BS unit side 
and site piping side connections 
to seal them.

Main unit

Main 
unit

Insulation tube 3)-2
(Accessory)

Attach facing up

Seam

Summary of Contents for VRV III BSVQ100P8V1B

Page 1: ...READ THESE INSTRUCTIONS CAREFULLY BEFORE INSTALLATION KEEP THIS MANUAL IN A HANDY PLACE FOR FUTURE REFERENCE INSTALLATION MANUAL BS unit BSVQ100P8V1B BSVQ160P8V1B BSVQ250P8V1B System air conditioner...

Page 2: ...enligt villkoren i 12 gitt i henhold til bestemmelsene i 13 noudattaen m r yksi 14 za dodr en ustanoven p edpisu 15 prema odredbama 16 k veti a z 17 zgodnie z postanowieniami Dyrektyw 18 n urma preve...

Page 3: ...life CAUTION Failure to observe these instructions properly may result in property damage or per sonal injury which may be serious depending on the circumstances WARNING Ask your dealer or qualified p...

Page 4: ...r Do not directly touch refrigerant that has leaked from refrigerant pipes or other areas as there is a danger of frostbite CAUTION Install the BS units power cord and connecting wires at least 1 mete...

Page 5: ...igned for R410A See the catalogue for indoor outdoor unit models that can be connected Normal operation is not possible when connecting units that are originally designed for other refrigerants 2 2 PR...

Page 6: ...icient clearance for maintenance and service can be ensured Refer to Fig 1 Locations where an inspection hole Refer to Fig 2 can be installed to EL COMPO BOX side See Note Where the total piping lengt...

Page 7: ...r the like Install the BS unit so that its weight can be withstood Hanging bracket For supporting the connection pipe Be sure to support the connection piping around the unit using hanging brackets th...

Page 8: ...0 3 pcs 4 locations and washers For M8 Outside diameter dimension 24 to 28mm For M10 Outside diameter 30 to 34mm 2 pcs 4 locations field supply from both the top and bottom sides of the hanging bracke...

Page 9: ...nstallation Make sure that nothing besides the specified refrigerant such as air gets into the refrigerant piping If refrigerant gas leaks during the work ventilate the area The outdoor units are fill...

Page 10: ...the refrigerant pipe joints Using a chlorine flux may cause the pipes to corrode and if it contains fluoride it may cause the refrigerant lubricant to deteriorate adversely affecting the refrigerant...

Page 11: ...door units Piping size outer diameter x minimum thickness Gas pipe Liquid pipe 20 25 32 40 50 12 7x0 80 6 4x0 80 63 80 100 125 15 9x0 99 9 5x0 80 200 19 1x0 80 250 22 2x0 80 mm BS unit Piping size out...

Page 12: ...uid pipe Site piping Gas pipe Site piping Liquid pipe Site piping BS unit Top Accessory pipes 1 2 Accessory pipes 1 1 Gas pipe Site piping Liquid pipe Site piping BS unit Top Suction gas pipe Site pip...

Page 13: ...ation field supply with the seams facing up See figure at right BSVQ100 160P type BSVQ250P type BS unit BS unit Clamp 2 2 Accessory Clamp 2 2 Accessory Insulation tube 3 2 Accessory Insulation tube 3...

Page 14: ...tion Do not turn on the power supply branch switches overload interrupters until all other work is done 7 2 EXAMPLE FOR THE WHOLE SYSTEM 7 3 POWER CIRCUIT SAFETY DEVICE AND CABLE REQUIREMENTS A power...

Page 15: ...the EL COMPO BOX lid and connect the wires to F1 and F2 TO IN D UNIT and F1 and F2 TO OUT D UNIT transmission wiring terminals control PCB A1P At this time pass the wiring into the unit through the w...

Page 16: ...the wire through hole to protect the wires Do not pass the transmission wiring and power supply wiring through the same locations and outside of the unit keep them separated by at least 50mm Not doing...

Page 17: ...er to the Engineering data book Setting method The setting is made using the Local Setting Mode by the remote controller of indoor unit connected to the BS unit For information regarding the setting m...

Page 18: ...MPO BOX NOTES PRINTED CIRCUIT BOARD DIP SWITCH FUSE T 3 15A 250V FLASHING LAMP SERVICE MONITOR GREEN SWITCHING POWER SUPPLY A1P TERMINAL STRIP POWER TERMINAL STRIP CONTROL TERMINAL STRIP C H SELECTOR...