background image

250FC
Total Heat Exchanger
HRV (Heat Reclaim Ventilation)
4P415946-1 – 2015.08

Installation manual

4

S

YSTEM

Independent system

Air conditioner linked operation system 

System

Standard method

Related items in 

Electric wiring

Independent system

• Up to 16 units can be controlled with the

remote controller for HRV. (A system with
two remote controls can be created in the
master/slave switching.)

• All HRV operations can be used and

indicated.

• Operation monitor output and humidifier

operation are possible using Adapter
PCB.

• Remote control cord should be procured

locally.
(Maximum cord length: 500 m)

"When connecting to 

Remote controller for 

HRV" on page 13

Combined 

operation system 

with VRV systems 
and Sky-air series

1-group linked 

operation system

• A combined total of up to 16 air

conditioners and the HRV can be
controlled.

• The HRV ventilation mode can be

operated independently when air
conditioners are not being used.

• Using the local setting of the remote

controller for air conditioners, various
settings such as precool/pre-heat
reservation on/off, ventilation flow rate,
ventilation mode, etc.

"Standard 1-group 

linked-control 

system" on page 13

Multi-group 

(2 or more) linked 

operation system

• Since all VRV units are connected to a

single line in view of installation, all VRV
units are subjects for operation.

• If there are problems operating all VRV

units, do not use this system.

"Linked control with 

more than two 

groups" on page 14

HRV

HRV

1

2

1

Remote controller 
for HRV

2

2-wire cord 
(produced locally)

VRV

HRV

1

2

1

Remote controller 
for air conditioner
(Remote controller 
for HRV)

2

Remote controller 
for air conditioner

VRV

VRV

VRV

VRV

HRV

HRV

1

2

5

5

5

5

3

4

6

1

Group 1

4

Group 4

2

Group 2

5

Remote controller 
for HRV

3

Group 3

6

Distant control 
adapter

NOTE

Adapter PCB: KPR50-2 ; Distant control adapter: KRP2A61: Installation box for adapter PCB: KRP50-2A90

Operation of two or more group is not possible with direct duct connection.

With VAM types, the direct duct connection shown can also be selected for 1-group operation systems.

System

Standard method

Related items in 

Electric wiring

Direct duct connection system

• The HRV will operate only when the air

conditioner fan is on.

• When the air conditioner is not being

used, the HRV can be operated in
circulation or ventilation modes.

• Other specifications are the same as

those of the standard system.

"Direct duct 

connection system 

for 1-group operation 

system" on page 14

VRV

HRV

1

2

3

1

Remote controller 
for air conditioner
(Remote controller 
for HRV)

2

Remote controller 
for air conditioner

3

Duct

Summary of Contents for VAM250FC

Page 1: ...aim Ventilation of Hergebruik van warmte Type voor plafondmontage met kanaalaansluiting Nederlands Intercambiador de Calor Total HRV Ventilaci n de Reclamo de Calor Tipo de conducto montado en el tech...

Page 2: ...50 250 149 104 269 718 760 600 164 90 124 200 20 20 164 3 4 1 9 2 5 7 8 6 12 11 10 2 4 14 15 16 13 A B VAM150F 145 97 VAM250F 132 146 2 2 VAM 280 415 150 250 600 415 280 112 2 3 18 11 9 1 18 10 10 17...

Page 3: ...ertificato C 07 A B C 08 Nota tal como estabelecido em A e com o parecer positivo de B de acordo com o Certificado C 09 A B C 10 Bem rk som anf rt i A og positivt vurderet af B i henhold til Certifika...

Page 4: ...lation Always use the air filter If the air filter is not used heat exchange elements will be clogged possibly causing poor performance and subsequent failure Do not change operations suddenly It can...

Page 5: ...ment this product may cause radio interference in which case the user may be required to take adequate measures 1 Air suction discharge grille option 2 Inspection hole 450 mm field supply 3 Maintenanc...

Page 6: ...he indoor air intake as far as from the opening of the exhaust suction 4 Use the duct applicable to the model of unit used Refer to the outline drawing 5 Install the two outdoor ducts with down slope...

Page 7: ...operation system Since all VRV units are connected to a single line in view of installation all VRV units are subjects for operation If there are problems operating all VRV units do not use this syste...

Page 8: ...trol device All individual control on page 15 Zone control system Use of the centralized controller enables zone control via the centralized control line maximum of 64 zones The central controller dis...

Page 9: ...eep total current of crossover wiring between indoor units less than 12 A When using two power wiring of a gauge greater than 2 mm2 1 6 branch the line outside the terminal board of the unit in accord...

Page 10: ...conform to Japanese standards stipulated in the Electric Appliance Regulatory Act Transmission wiring need not be grounded when using sheathed wire 1 2 5 3 4 6 7 8 A B C 1 Terminal board for transmis...

Page 11: ...controller for incorporating function of the external damper in the system Mode No 18 Group control or 28 Individual control Setting switch No 3 Setting position No 03 CAUTION Before opening the cove...

Page 12: ...required Install the heater control kit to the outside of the switch box of the HRV unit as shown below For more detailed information on how to install the BRP4A50 option kit see the installation man...

Page 13: ...ngs for individual units under group control when mode No 27 28 or 29 is selected press the TIMER SETTING ON OFF button to select the unit No for which the settings are to be made This process is not...

Page 14: ...command Priority on external input 1 Setting for direct Power ON Off On 2 Auto restart setting Off On 3 Setting for external damper On 4 Indication of ventilation mode Not indication Indication No In...

Page 15: ...and Heat Exchange mode Heat Exchange mode In this mode the air passes through the heat exchange element to effect Total Heat Exchanging ventilation Bypass mode In this mode the air does not pass throu...

Page 16: ...l pre heat function When the pre cool pre heat function is set the HRV unit switches on at the preset time 30 45 or 60 minutes after the VRV system air conditioner begins cooling or heating operation...

Page 17: ...formed using the air conditioner remote control Set the mode number to 17 the setting switch number to 5 and the setting position number to 02 according to the procedure in Local setting on page 10 Wh...

Page 18: ...r flow rate from High to Ultra High connect the remote controller for the air conditioner to HRV and make settings on site Refer to Initial setting under item Local setting on page 10 All individual c...

Page 19: ...setting of the group number refer to the section on the centralized control group number setting in the operating instructions of the Centralized controller Refer to the section All individual control...

Page 20: ...ample of control wiring System description TEST RUN After completing the installation of the system check again to make sure that No error was made in wiring or switch setting on the printed circuit b...

Page 21: ...Magnetic relay M1D M1D Motor Damper motor M1F Motor Air supply Fan motor M2F Motor Exhaust Fan motor Q1L Q2L Thermo switch M1F M2F Built in R1T Thermistor Indoor air R2T Thermistor Outdoor air S1W Li...

Page 22: ...NOTES...

Page 23: ...NOTES...

Page 24: ...4P415946 1 2015 08 Copyright 2015 Daikin...

Reviews: