CAUTION
•
Refer to “b. Items to be checked at time of delivery” on page 4 upon completion of the test run and make
sure that all the items are checked.
•
If the customer’s interior work has not been finished on completion of the test run, explain the customer
not to operate the air conditioner. This is essential until the interior work is finished so as to protect the
product.
Substances generated from paints and adhesives used for the interior work may contaminate the product
if the unit is operated.
When delivering the product to the customer after the test run is completed, check that the control box lid,
the air filter and the suction grille are mounted. In addition, explain to the customer regarding the state
(ON/OFF) of the power supply breaker.
12. WIRING DIAGRAM
(Refer to Fig. 34.35.)
1
TO OUTDOOR UNIT
2
(NOTE) 6
3
WIRED REMOTE CONTROLLER
4
IN CASE OF SIMULTANEOUS OPERA-
TION SYSTEM
5
INDOOR UNIT (MASTER)
6
INDOOR UNIT (SLAVE)
7
RECEIVER/DISPLAY UNIT
8
REMOTE CONTROLLER
9
(NOTE) 7
10
(NOTE) 4
11
CONTROL BOX
12
(NOTE) 10
13
WIRELESS REMOTE CONTROLLER
14
OPTIONAL ACCESSORY
15
(NOTE) 8
To test run Contractors
01_EN_3PN06588-4M.fm Page 25 Monday, December 19, 2011 7:04 PM