![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-fdks25eavmb/super-multi-nx-fdks25eavmb_installation-manual_2459115011.webp)
9
English
INSTALLING THE DUCT
Connect the duct supplied in the field.
Air inlet side
• Attach the duct and intake-side flange (field supply).
• Connect the flange to the main unit with accessory screws (in 16, 20 or 24 positions).
• Wrap the intake-side flange and duct connection area with aluminum tape or something similar to prevent air escaping.
Caution
When attaching a duct to the intake side, be sure also to attach an air filter inside the air passage on the intake side. (Use an air
filter whose dust collecting efficiency is at least 50% in a gravimetric technique.)
Outlet side
• Connect the duct according to the inside of the outlet-side flange.
• Wrap the outlet-side flange and the duct connection area with aluminum tape or something similar to prevent air escaping.
Caution
• Be sure to insulate the duct to prevent condensation from forming. (Material: glass wool or polyethylene foam, 25mm thick)
• Use electric insulation between the duct and the wall when using metal ducts to pass metal laths of the net or fence shape or
metal plating into wooden buildings.
Main unit
Air inlet side
Outlet side
Connection screw
(accessory)
(Field supply)
(Field supply)
(Field supply)
(Field supply)
Flange
Flange
Aluminum tape
Aluminum tape
Insulation material
01_EN_3P132003-3K.fm Page 9 Wednesday, September 28, 2005 3:32 PM
Summary of Contents for Super Multi NX FDKS25EAVMB
Page 14: ...0511 HT 3P132003 3K M05B026A...