![background image](http://html1.mh-extra.com/html/daikin/super-multi-nx-ctxs07jvju/super-multi-nx-ctxs07jvju_service-manual_3423788268.webp)
SiUS12-928_B
Trial Operation
Trial Operation and Field Settings
260
ARC433 Series
(1) Press the [ON/OFF] button to turn on the system.
(2) Press the center of the [TEMP] button and the [MODE] button at the same time.
(3) Press the [MODE] button twice.
(
T
appears on the display to indicate that trial operation is selected.)
(4) Press the [MODE] button and select the operation mode.
(5) Trial operation terminates in approx. 30 minutes and switches into normal mode. To quit a trial
operation, press the [ON/OFF] button.
(2)
(1) (5)
(3)
(2) (3) (4)
(R16394)