background image

5 Piping installation

Installation manual

9

AZAS100~140MUV/Y
Sky Air Active-series
4P743507-1 – 2023.08

A
B

b

a

A

Stop valve (liquid)

B

Stop valve (gas)

a

Liquid piping

b

Gas piping

4

Insulate the refrigerant piping:

▪ Insulate the liquid piping (a) and the gas piping (b).
▪ Wind  heat  insulation  around  the  curves,  and  then  cover  it

with vinyl tape (e).

▪ Make  sure  the  field  piping  does  not  touch  any  compressor

components (d).

▪ Seal the insulation ends (sealant etc.) (c).

Example:  Front connection

A
B

e

c

d
a
b

A

Stop valve (liquid)

B

Stop valve (gas)

a

Liquid piping

b

Gas piping

c

Insulation ends

d

Compressor

e

Vinyl tape

Example:  Rear connection

A
B

c

e

d
a
b

A

Stop valve (liquid)

B

Stop valve (gas)

a

Liquid piping

b

Gas piping

c

Insulation ends

d

Compressor

e

Vinyl tape

5

If  the  outdoor  unit  is  installed  above  the  indoor  unit,  cover  the
stop  valves  (A,B  see  above)  with  sealing  material  to  prevent
condensed water on the stop valves from moving to the indoor
unit.

NOTICE

Any exposed piping might cause condensation.

6

Reattach the service cover and the piping intake plate.

7

Seal  all  gaps  (example:  a)  to  prevent  snow  and  small  animals
from entering the system.

a

NOTICE

Do not block the air vents. This could affect air circulation
inside the unit.

WARNING

Provide adequate measures to prevent that the unit can be
used  as  a  shelter  by  small  animals.  Small  animals  that
make contact with electrical parts can cause malfunctions,
smoke or fire.

NOTICE

Make  sure  to  open  the  stop  valves  after  installing  the
refrigerant  piping  and  performing  vacuum  drying.  Running
the  system  with  the  stop  valves  closed  may  break  the
compressor.

5.2

Checking the refrigerant piping

5.2.1

Checking refrigerant piping: Setup

R32

a

c

f

b

d

e

a

Pressure gauge

b

Nitrogen

c

Refrigerant

d

Weighing scale

e

Vacuum pump

f

Stop valve

Summary of Contents for Sky Air Active Series

Page 1: ...Installation manual Sky Air Active series English Installation manual Sky Air Active series AZAS100MUV AZAS125MUV AZAS140MUV AZAS100MUY AZAS125MUY AZAS140MUY...

Page 2: ...A B C 250 300 1000 A B C E 250 300 1000 1000 500 D 1000 D E 1000 1000 500 B D HD HU 300 1000 HD HU 250 1500 HU HD HU 300 1500 B D E HB HD HB HU 300 1000 1000 500 HU HB HU 300 1250 1000 500 HB HU HB H...

Page 3: ...e Outdoor unit 17 11 2 Piping diagram Outdoor unit 18 11 3 Wiring diagram Outdoor unit 19 1 About this document Target audience Authorised installers INFORMATION This appliance is intended to be used...

Page 4: ...l the required fuses or circuit breakers Secure the electrical wiring with cable ties so that the cables do NOT come in contact with sharp edges or piping particularly on the high pressure side Do NOT...

Page 5: ...h the instructions from this manual See 9 Commissioning 415 3 About the box Keep the following in mind At delivery the unit MUST be checked for damage and completeness Any damage or missing parts MUST...

Page 6: ...rging refrigerant 412 1 3 If necessary remove the piping intake rear plate This is e g necessary in the following cases 5 1 Connecting the refrigerant piping 48 6 4 To connect the electrical wiring to...

Page 7: ...ly a 4 3 2 To install the outdoor unit 4 M12 4 3 3 To provide drainage INFORMATION If necessary you can use a drain plug kit field supply to prevent drain water from dripping NOTICE If drain holes of...

Page 8: ...ection d Rear connection 1 Remove the following plates For details see 4 2 1 To open the outdoor unit 46 Remove the service cover a and the piping intake front plate b In case the refrigerant piping i...

Page 9: ...the indoor unit cover the stop valves A B see above with sealing material to prevent condensed water on the stop valves from moving to the indoor unit NOTICE Any exposed piping might cause condensatio...

Page 10: ...eck the pressure for at least 1 hour 5 If you do NOT reach the target vacuum or CANNOT maintain the vacuum for 1 hour do the following Check for leaks again Perform vacuum drying again NOTICE Make sur...

Page 11: ...a round crimp style terminal Details are described in Guidelines when connecting the electrical wiring in the installer reference guide 6 4 To connect the electrical wiring to the outdoor unit NOTICE...

Page 12: ...rging additional refrigerant typically consists of the following stages 1 Determining if and how much you have to charge additionally 2 If necessary charging additional refrigerant 3 Filling in the fl...

Page 13: ...accelerate the defrosting process other than those recommended by the manufacturer Be aware that the refrigerant inside the system is odourless 7 3 Completely recharging refrigerant 7 3 1 To determin...

Page 14: ...Applicable legislation on fluorinated greenhouse gases requires that the refrigerant charge of the unit is indicated both in weight and CO2 equivalent Formula to calculate the quantity in CO2 equival...

Page 15: ...e of the compressor is OK There are NO damaged components or squeezed pipes on the inside of the indoor and outdoor units There are NO refrigerant leaks The correct pipe size is installed and the pipe...

Page 16: ...ote Operation will be impossible Turn OFF the power recheck the wiring and switch two of the three electrical wires L4 The air inlet or air outlet is blocked U0 The stop valves are closed U2 There is...

Page 17: ...rvice space between the unit and obstacles A B C D and E eB Maximum distance between the unit and the edge of obstacle E in the direction of obstacle B eD Maximum distance between the unit and the edg...

Page 18: ...ort Service port with 5 16 flare Stop valve Filter Check valve Solenoid valve Heat sink PCB Capillary tube Electronic expansion valve 4 way valve High pressure switch LPS Low pressure switch Compresso...

Page 19: ...l Optional Part n Part n Description Description A1P Printed circuit board main A2P Printed circuit board noise filter BS1 BS3 A1P Push button switch on PCB C A1P Y only Capacitor DS1 A1P Dipswitch E...

Page 20: ...11 Technical data Installation manual 20 AZAS100 140MUV Y Sky Air Active series 4P743507 1 2023 08 L L A L B NA NB E U V W X A A1P A2P Connector...

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ...4P743507 1 2023 08 Copyright 2023 Daikin 4P743507 1 0000000O Verantwortung f r Energie und Umwelt...

Reviews: