![Daikin Sky Air Active Series Installation Manual Download Page 11](http://html2.mh-extra.com/html/daikin/sky-air-active-series/sky-air-active-series_installation-manual_5689747011.webp)
6 Electrical installation
Installation manual
11
AZAS100~140MUV/Y
Sky Air Active-series
4P743507-1 – 2023.08
6.3
Specifications of standard wiring components
Component
AZAS100~140MUV
AZAS100~140MUY
100
125
140
100
125+140
Power supply cable
MCA
(a)
21.8 A
28.3 A
27.6 A
14.6 A
15.1 A
Voltage range
220~240 V
380~415 V
Phase
1~
3N~
Frequency
50 Hz
Wire sizes
Must comply with national wiring regulation
3-core cable
5-core cable
Wire size based on the current, but not less than:
4.0 mm
2
2.5 mm
2
Interconnection cable (indoor ↔
outdoor)
Voltage
220-240 V
Wire size
Only use harmonised wire providing double insulation and suitable for
applicable voltage.
4-core cable
Minimum 2.5 mm
2
Recommended field fuse
25 A
32 A
16 A
Earth leakage circuit breaker / residual current device
Must comply with national wiring regulation
(a)
MCA=Minimum circuit ampacity. Stated values are maximum values (see electrical data of combination with indoor units for exact values).
NOTICE
We recommend using solid (single-core) wires. If stranded
wires are used, slightly twist the strands to consolidate the
end of the conductor for either direct use in the terminal
clamp or insertion in a round crimp-style terminal. Details
are described in "Guidelines when connecting the electrical
wiring" in the installer reference guide.
6.4
To connect the electrical wiring to
the outdoor unit
NOTICE
▪ Follow the wiring diagram (delivered with the unit,
located at the inside of the service cover).
▪ Make sure the electrical wiring does NOT obstruct
proper reattachment of the service cover.
1
Remove the service cover.
2
Connect the interconnection cable and power supply as follows:
c
a
d
e
1~50 Hz
220-240 V
3N~50 Hz
380-415 V
AZAS-MV
AZAS-MY
L1 L2 L3
L1 L2 L3
N
b
b
a
Interconnection cable
b
Power supply cable
c
Earth leakage circuit breaker
d
Fuse
e
User interface
Example:
AZAS100~140MUV
c
e
f
b
g
d
d
a
2×
a
Switch box
b
Stop valve attachment plate
c
Terminal block
d
Earth wire
e
Power supply cable
f
Interconnection cable
g
Tie wrap
3
Fix the cables (power supply and interconnection cable) with a
cable tie to the stop valve attachment plate and route the wiring
according to the illustration above.
4
Choose a knockout hole and remove the knockout hole by
tapping on the attachment points with a flat head screwdriver
and a hammer.
5
Route the wiring through the frame and connect the wiring to
the frame at the knockout hole.
Routing through
the frame
Choose one of the 3 possibilities:
a
b
a
b
a
b
2
3
1
a
Power supply cable
b
Interconnection cable