background image

6 Electrical installation

Installation manual

11

AZAS100~140MUV/Y
Sky Air Active-series
4P743507-1 – 2023.08

6.3

Specifications of standard wiring components

Component

AZAS100~140MUV

AZAS100~140MUY

100

125

140

100

125+140

Power supply cable

MCA

(a)

21.8 A

28.3 A

27.6 A

14.6 A

15.1 A

Voltage range

220~240 V

380~415 V

Phase

1~

3N~

Frequency

50 Hz

Wire sizes

Must comply with national wiring regulation

3-core cable

5-core cable

Wire size based on the current, but not less than:

4.0 mm

2

2.5 mm

2

Interconnection cable (indoor ↔
outdoor)

Voltage

220-240 V

Wire size

Only use harmonised wire providing double insulation and suitable for

applicable voltage.

4-core cable

Minimum 2.5 mm

2

Recommended field fuse

25 A

32 A

16 A

Earth leakage circuit breaker / residual current device

Must comply with national wiring regulation

(a)

MCA=Minimum circuit ampacity. Stated values are maximum values (see electrical data of combination with indoor units for exact values).

NOTICE

We recommend using solid (single-core) wires. If stranded
wires are used, slightly twist the strands to consolidate the
end  of  the  conductor  for  either  direct  use  in  the  terminal
clamp  or  insertion  in  a  round  crimp-style  terminal.  Details
are described in "Guidelines when connecting the electrical
wiring" in the installer reference guide.

6.4

To connect the electrical wiring to
the outdoor unit

NOTICE

▪ Follow  the  wiring  diagram  (delivered  with  the  unit,

located at the inside of the service cover).

▪ Make  sure  the  electrical  wiring  does  NOT  obstruct

proper reattachment of the service cover.

1

Remove the service cover.

2

Connect the interconnection cable and power supply as follows:

c

a

d

e

1~50 Hz

220-240 V

3N~50 Hz

380-415 V

AZAS-MV

AZAS-MY

L1 L2 L3

L1 L2 L3

N

b

b

a

Interconnection cable

b

Power supply cable

c

Earth leakage circuit breaker

d

Fuse

e

User interface

Example: 

 AZAS100~140MUV

c

e

f

b

g

d

d

a

a

Switch box

b

Stop valve attachment plate

c

Terminal block

d

Earth wire

e

Power supply cable

f

Interconnection cable

g

Tie wrap

3

Fix the cables (power supply and interconnection cable) with a
cable tie to the stop valve attachment plate and route the wiring
according to the illustration above.

4

Choose  a  knockout  hole  and  remove  the  knockout  hole  by
tapping  on  the  attachment  points  with  a  flat  head  screwdriver
and a hammer.

5

Route  the  wiring  through  the  frame  and  connect  the  wiring  to
the frame at the knockout hole.

Routing through
the frame

Choose one of the 3 possibilities:

a

b

a

b

a

b

2

3

1

a

 Power supply cable

b

 Interconnection cable

Summary of Contents for Sky Air Active Series

Page 1: ...Installation manual Sky Air Active series English Installation manual Sky Air Active series AZAS100MUV AZAS125MUV AZAS140MUV AZAS100MUY AZAS125MUY AZAS140MUY...

Page 2: ...A B C 250 300 1000 A B C E 250 300 1000 1000 500 D 1000 D E 1000 1000 500 B D HD HU 300 1000 HD HU 250 1500 HU HD HU 300 1500 B D E HB HD HB HU 300 1000 1000 500 HU HB HU 300 1250 1000 500 HB HU HB H...

Page 3: ...e Outdoor unit 17 11 2 Piping diagram Outdoor unit 18 11 3 Wiring diagram Outdoor unit 19 1 About this document Target audience Authorised installers INFORMATION This appliance is intended to be used...

Page 4: ...l the required fuses or circuit breakers Secure the electrical wiring with cable ties so that the cables do NOT come in contact with sharp edges or piping particularly on the high pressure side Do NOT...

Page 5: ...h the instructions from this manual See 9 Commissioning 415 3 About the box Keep the following in mind At delivery the unit MUST be checked for damage and completeness Any damage or missing parts MUST...

Page 6: ...rging refrigerant 412 1 3 If necessary remove the piping intake rear plate This is e g necessary in the following cases 5 1 Connecting the refrigerant piping 48 6 4 To connect the electrical wiring to...

Page 7: ...ly a 4 3 2 To install the outdoor unit 4 M12 4 3 3 To provide drainage INFORMATION If necessary you can use a drain plug kit field supply to prevent drain water from dripping NOTICE If drain holes of...

Page 8: ...ection d Rear connection 1 Remove the following plates For details see 4 2 1 To open the outdoor unit 46 Remove the service cover a and the piping intake front plate b In case the refrigerant piping i...

Page 9: ...the indoor unit cover the stop valves A B see above with sealing material to prevent condensed water on the stop valves from moving to the indoor unit NOTICE Any exposed piping might cause condensatio...

Page 10: ...eck the pressure for at least 1 hour 5 If you do NOT reach the target vacuum or CANNOT maintain the vacuum for 1 hour do the following Check for leaks again Perform vacuum drying again NOTICE Make sur...

Page 11: ...a round crimp style terminal Details are described in Guidelines when connecting the electrical wiring in the installer reference guide 6 4 To connect the electrical wiring to the outdoor unit NOTICE...

Page 12: ...rging additional refrigerant typically consists of the following stages 1 Determining if and how much you have to charge additionally 2 If necessary charging additional refrigerant 3 Filling in the fl...

Page 13: ...accelerate the defrosting process other than those recommended by the manufacturer Be aware that the refrigerant inside the system is odourless 7 3 Completely recharging refrigerant 7 3 1 To determin...

Page 14: ...Applicable legislation on fluorinated greenhouse gases requires that the refrigerant charge of the unit is indicated both in weight and CO2 equivalent Formula to calculate the quantity in CO2 equival...

Page 15: ...e of the compressor is OK There are NO damaged components or squeezed pipes on the inside of the indoor and outdoor units There are NO refrigerant leaks The correct pipe size is installed and the pipe...

Page 16: ...ote Operation will be impossible Turn OFF the power recheck the wiring and switch two of the three electrical wires L4 The air inlet or air outlet is blocked U0 The stop valves are closed U2 There is...

Page 17: ...rvice space between the unit and obstacles A B C D and E eB Maximum distance between the unit and the edge of obstacle E in the direction of obstacle B eD Maximum distance between the unit and the edg...

Page 18: ...ort Service port with 5 16 flare Stop valve Filter Check valve Solenoid valve Heat sink PCB Capillary tube Electronic expansion valve 4 way valve High pressure switch LPS Low pressure switch Compresso...

Page 19: ...l Optional Part n Part n Description Description A1P Printed circuit board main A2P Printed circuit board noise filter BS1 BS3 A1P Push button switch on PCB C A1P Y only Capacitor DS1 A1P Dipswitch E...

Page 20: ...11 Technical data Installation manual 20 AZAS100 140MUV Y Sky Air Active series 4P743507 1 2023 08 L L A L B NA NB E U V W X A A1P A2P Connector...

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ...4P743507 1 2023 08 Copyright 2023 Daikin 4P743507 1 0000000O Verantwortung f r Energie und Umwelt...

Reviews: