![background image](http://html1.mh-extra.com/html/daikin/rzq71kavlt/rzq71kavlt_service-manual_2460023008.webp)
Procedure to Remove Assy (2)
Si281314E
6
Removal Procedure
5. Procedure to Remove Assy (2)
Procedure
Warning Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
2. Remove the mounting
plate for the electric
component
After removing the mounted electric component
1
Remove the mounting
plate for the terminal
block, after removing
the 1 screw.
2
Remove the 2
connectors on the
reactor.
3
Cut 3 clamps that fix the
wiring.
4
Remove the mounting
plate for the electric
component after
removing the 2 screws.
(cf)
Fixing screws
Fixing screw
Connectors
Reactor
Clamps
Mounting plate for the
electric component
Mounting plate for
the terminal block
X6A
X21A
X5A
X13A
X11A
X41A
X17A
X25A X77A X803A
X12A
X106A
X11A
LB
E
LA
NA
LC
W
V
U
DB501
IPM501
DB502
D531
D532
Q501