7 Commissioning

Installation and operation manual

21

RXYTQ8~16T7YF
VRV IV system air conditioner
4P388987-1C – 2016.02

[2‑35]

Description

0

In case the outdoor unit is installed in the
lowest position (indoor units are installed on a
higher position than outdoor units) and the
height difference between the highest indoor
unit and the outdoor unit exceeds 40 m, the
setting [2‑35] should be changed to 0.

1 (default)

[2‑49]

Height difference setting.

[2‑49]

Description

0 (default)

1

In case the outdoor unit is installed in the
highest position (indoor units are installed on a
lower position than outdoor units) and the
height difference between the lowest indoor
unit and the outdoor unit exceeds 50 m, the
setting [2‑49] has to be changed to 1.

6.1.9

To connect the PC configurator to the
outdoor unit

X27A

a

b

c

2

3

4

5

H J

ST

X27A

A1P

a

PC

b

Cable (EKPCCAB)

c

Outdoor unit main PCB

7

Commissioning

After installation and once the field settings are defined, the installer
is  obliged  to  verify  correct  operation.  Therefore  a  test  run  must  be
performed according to the procedures described below.

7.1

Precautions when commissioning

CAUTION

Do not perform the test operation while working on the
indoor units.

When  performing  the  test  operation,  not  only  the  outdoor
unit,  but  the  connected  indoor  unit  will  operate  as  well.
Working on an indoor unit while performing a test operation
is dangerous.

NOTICE

Be  sure  to  turn  on  the  power  6  hours  before  operation  in
order  to  have  power  running  to  the  crankcase  heater  and
to protect the compressor.

During test operation, the outdoor unit and the indoor units will start
up.  Make  sure  that  the  preparations  of  all  indoor  units  are  finished
(field  piping,  electrical  wiring,  air  purge,  ...).  See  installation  manual
of the indoor units for details.

7.2

Checklist before commissioning

After the installation of the unit, first check the following items. Once
all below checks are fulfilled, the unit must be closed, only then can
the unit be powered up.

You  read  the  complete  installation  and  operation
instructions,  as  described  in  the 

installer  and  user

reference guide

.

Installation

Check that the unit is properly installed, to avoid abnormal
noises and vibrations when starting up the unit.

Field wiring

Be  sure  that  the  field  wiring  has  been  carried  out
according  to  the  instructions  described  in  the  chapter

"5.7  Connecting  the  electrical  wiring"  on  page  16

,

according  to  the  wiring  diagrams  and  according  to  the
applicable legislation.

Power supply voltage

Check the power supply voltage on the local supply panel.
The  voltage  must  correspond  to  the  voltage  on  the
identification label of the unit.

Earth wiring

Be  sure  that  the  earth  wires  have  been  connected
properly and that the earth terminals are tightened.

Insulation test of the main power circuit

Using  a  megatester  for  500  V,  check  that  the  insulation
resistance  of  2  MΩ  or  more  is  attained  by  applying  a
voltage of 500 V DC between power terminals and earth.
Never use the megatester for the transmission wiring.

Fuses, circuit breakers, or protection devices

Check  that  the  fuses,  circuit  breakers,  or  the  locally
installed  protection  devices  are  of  the  size  and  type
specified 

in 

the 

chapter 

"4.3.1 

Safety 

device

requirements" on page 7

. Be sure that neither a fuse nor a

protection device has been bypassed.

Internal wiring

Visually  check  the  electrical  component  box  and  the
inside  of  the  unit  on  loose  connections  or  damaged
electrical components.

Pipe size and pipe insulation

Be  sure  that  correct  pipe  sizes  are  installed  and  that  the
insulation work is properly executed.

Stop valves

Be  sure  that  the  stop  valves  are  open  on  both  liquid  and
gas side.

Damaged equipment

Check  the  inside  of  the  unit  on  damaged  components  or
squeezed pipes.

Refrigerant leak

Check the inside of the unit on refrigerant leakage. If there
is  a  refrigerant  leak,  try  to  repair  the  leak.  If  the  repair  is
unsuccessful,  call  your  local  dealer.  Do  not  touch  any
refrigerant  which  has  leaked  out  from  refrigerant  piping
connections. This may result in frostbite.

Oil leak

Check  the  compressor  for  oil  leakage.  If  there  is  an  oil
leak, try to repair the leak. If the repairing is unsuccessful,
call your local dealer.

Air inlet/outlet

Check  that  the  air  inlet  and  outlet  of  the  unit  is  not
obstructed  by  paper  sheets,  cardboard,  or  any  other
material.

Summary of Contents for RXYTQ8T7YF

Page 1: ...Installation and operation manual VRV IV system air conditioner English Installation and operation manual VRV IV system air conditioner RXYTQ8T7YF RXYTQ10T7YF RXYTQ12T7YF RXYTQ14T7YF RXYTQ16T7YF...

Page 2: ...iring Overview 16 5 7 2 Guidelines when knocking out knockout holes 16 5 7 3 To route and fix the transmission wiring 16 5 7 4 To connect the transmission wiring 17 5 7 5 To finish the transmission wi...

Page 3: ...AL SETTING 40 30 10 20 19 9 29 39 38 28 8 18 17 7 27 37 36 26 6 16 15 5 25 35 34 23 24 4 3 2 1 INSTALLATION MODELNAME No 12 13 14 50 49 48 47 46 45 60 59 58 57 56 64 63 62 61 11 22 21 33 32 31 44 43 4...

Page 4: ...nd in cooling mode at ambient temperatures from 5 C DB to 52 C DB 3 2 System layout NOTICE Design of the system must not be done at temperatures below 15 C e d c c b f a a VRV IV Heat pump outdoor uni...

Page 5: ...200 19 1 200 x 290 22 2 Indoor unit capacity index Piping outer diameter size mm Gas pipe Liquid pipe 290 x 420 28 6 12 7 420 x 640 15 9 640 x 920 34 9 19 1 920 41 3 Example Downstream capacity for E...

Page 6: ...HRQ22M64T 640 KHRQ22M75T Concerning refnet headers choose from the following table in accordance with the total capacity of all the indoor units connected below the refnet header Indoor unit capacity...

Page 7: ...adding the minimum circuit amps of each used unit according to the table above multiply the result by 1 1 and select the next higher recommended fuse capacity Example Combining the RXYTQ30 by using t...

Page 8: ...stallation is on a solid longitudinal foundation steel beam frame or concrete The foundation must be larger than the grey marked area 729 613 929 AB AA a mm Minimum foundation a Anchor point 4 HP AA A...

Page 9: ...abel a attached to the joint comes to the top Do not tilt the joint more than 7 5 see view A Do not install the joint vertically see view B a a A B 7 5 7 5 a Caution label X Not allowed O Allowed Make...

Page 10: ...o close Shaft Valve body Hexagonal wrench Cap valve lid Service port 9 5 5 4 6 6 4 mm 13 5 16 5 11 5 13 9 12 7 8 1 9 9 18 0 22 0 15 9 13 5 16 5 6 mm 23 0 27 0 19 1 27 0 33 0 8 mm 22 5 27 5 25 4 5 3 7...

Page 11: ...ait until the outdoor unit has finished the initialisation to apply setting 2 21 Leak test and vacuum drying Checking the refrigerant piping involves Checking for any leakages in the refrigerant pipin...

Page 12: ...Should you fail to reach the target vacuum within 2 hours or maintain the vacuum for 1 hour the system may contain too much moisture In that case break the vacuum by pressurising with nitrogen gas to...

Page 13: ...e see 5 6 5 To charge refrigerant on page 15 It can be skipped but charging will take longer then A flow chart is available which gives an overview of the possibilities and actions to be taken see 5 6...

Page 14: ...refrigerant charge label Go to test run Step 3b Close valves C and B R Q R Q R Q Continued on next page p p R410A N2 C A B Charging refrigerant Step 5 Proceed with manual charge Step 6 Activate field...

Page 15: ...harge port and charge the remaining additional refrigerant through this port Open all outdoor unit stop valves At this point valve A must remain closed p p R410A a c d b A a Weighing scales b Refriger...

Page 16: ...n knocking out knockout holes To punch a knockout hole hit on it with a hammer After knocking out the holes we recommend removing any burrs and paint the edges and areas around the holes using repair...

Page 17: ...tion The wiring for the other systems must be connected to the F1 F2 Out Out terminals of the PCB in the outdoor unit to which the interconnecting wiring for the indoor units is connected The base uni...

Page 18: ...e push buttons it is possible to Perform special actions testrun etc Perform field settings demand operation low noise etc DIP switches By operating the DIP switches it is possible to DS1 1 COOL HEAT...

Page 19: ...ndoor units When the communication between indoor units and outdoor unit s is established and normal the 7 segment display indication state will be as below default situation when shipped from factory...

Page 20: ...or units 1 13 Shows the total number of connected outdoor units in case of multiple outdoor system 1 17 1 18 1 19 Shows 1 17 The latest malfunction code 1 18 The 2nd last malfunction code 1 19 The 3rd...

Page 21: ...n the installer and user reference guide Installation Check that the unit is properly installed to avoid abnormal noises and vibrations when starting up the unit Field wiring Be sure that the field wi...

Page 22: ...r 2 on page 19 Push BS2 for 5 seconds or more The unit will start test operation Result The test operation is automatically carried out the outdoor unit display will indicate and the indication Test o...

Page 23: ...n on PCB or actuator Discharge temperature too high R21T R22T Stop valve closed Refrigerant shortage Open stop valves Check refrigerant amount recharge unit Compressor casing temperature too high R8T...

Page 24: ...tion Transmission outdoor unit inverter INV2 transmission trouble A1P X20A X28A X40A Check connection INV1 unbalanced power supply voltage Check if power supply is within range INV2 unbalanced power s...

Page 25: ...ered unit amount by monitor mode or wait till initialisation is finished Stop valve closed or wrong during system test run Open stop valves 9 Technical data Latest information can be found in the tech...

Page 26: ...based on cooling operation at 46 C ambient temperature standard conditions INFORMATION Further specifications can be found in the technical engineering data 9 2 Piping diagram Outdoor unit Piping dia...

Page 27: ...L S1PH S2PH HPS R6T R5T R7T R1T R4T R21T R22T R3T HPS n a Compressor M1C b Compressor M2C c Heat exchanger d Fan e Fan motor M1F M2F f Accumulator g Expansion valve main Y1E h Expansion valve subcool...

Page 28: ...e found in the technical engineering data 12 2 Operating the system 12 2 1 About operating the system Operation procedure varies according to the combination of outdoor unit and user interface To prot...

Page 29: ...m temperature is low 20 C 12 3 2 To use the dry program WITHOUT cool heat changeover remote control switch To start 1 Press the operation mode selector button on the user interface several times and s...

Page 30: ...interface Only the master user interface can select heating or cooling mode 13 Maintenance and service NOTICE Never inspect or service the unit by yourself Ask a qualified service person to perform th...

Page 31: ...tify your installer and report the malfunction code If the system does not properly operate except for the above mentioned cases and none of the above mentioned malfunctions is evident investigate the...

Page 32: ...r units combined Indoor unit malfunction Connection malfunction over indoor units or type mismatch Centralised address duplication Malfunction in communication centralised control device indoor unit A...

Page 33: ...topped When another indoor unit is in operation this noise is heard In order to prevent oil and refrigerant from remaining in the system a small amount of refrigerant is kept flowing 14 2 10 Symptom N...