Outdoor Unit Installation

3.

Flaring the pipe end 

1) Cut the pipe end with a pipe cutter.
2) Remove burrs with the cut surface facing 

downward so that the chips do not enter the pipe.

3) Put the flare nut on the pipe.
4) Flare the pipe.
5) Check that the flaring is properly made.

WARNING

• Do not use mineral oil on flared part.
• Prevent mineral oil from getting into the system as this would reduce the lifetime of the units.
• Never use piping which has been used for previous installations. Only use parts which are delivered with the unit.
• Do never install a drier to this R410A unit in order to guarantee its lifetime.
• The drying material may dissolve and damage the system.
• Incomplete flaring may cause refrigerant gas leakage.

4.

Refrigerant piping

CAUTION

• Use the flare nut fixed to the main unit. (To prevent cracking of the flare nut by aged deterioration.)
• To prevent gas leakage, apply refrigeration oil only to the inner surface of the flare. (Use refrigeration oil for R410A.)
• Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage.

Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand.  Then tighten them fully with the torque wrenches. 

(Cut exactly at 

right angles.)

 Remove burrs.

Set exactly at the position shown below.

A

Flaring

Die

Check

Flare’s inner surface 
must be flaw-free.

The pipe end must 
be evenly flared in a 
perfect circle.

Make sure that the 
flare nut is fitted.

A

0-0.5mm

Clutch-type

Flare tool for R410A

1.0-1.5mm

Clutch-type (Rigid-type)

1.5-2.0mm

Wing-nut type (Imperial-type)

Conventional flare tool

Flare nut tightening torque

Liquid side

1/4 inch

14.2-17.2N • m

(144-175kgf • cm)

Gas side

1/2 inch

49.5-60.3N • m

(505-615kgf • cm)

Valve cap tightening torque

Liquid side

1/4 inch

21.6-27.4N • m

(220-280kgf • cm)

Gas side

1/2 inch

48.1-59.7N • m

(490-610kgf • cm)

Service port cap tightening torque

10.8-14.7N • m

(110-150kgf • cm)

Torque wrench

Piping union

Flare nut

Do not apply refrigeration 

oil to the outer surface.

Flare nut

Apply refrigeration oil to 

the inner surface of the 

flare.

Do not apply refrigeration 

oil to the flare nut avoid 

tightening with over torque.

Spanner

[Apply oil]

[Tighten]

01_EN_3P254362-2C.fm  Page 5  Friday, November 12, 2010  2:28 PM

Summary of Contents for RXS50J2V1B

Page 1: ...ds Espa ol Italiano Portugues T rk e English Montaj k lavuzlar R410A Split serisi Installation manual R410A Split series Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R...

Page 2: ...EC 3SB64564 9D RXS60F3V1B RKS60F3V1B RXS50G2V1B RKS50G2V1B ARXS50G2V1B ARXS50E3V1B RXS60F2V1B RKS60F2V1B RYN50E3V1B RYN60E3V1B RN50E3V1B RN60E3V1B RX50G2V1B RX60G2V1B Shinri Sada Manager Quality Contr...

Page 3: ...USTRIES LTD Low Voltage 2006 95 EC Electromagnetic Compatibility 2004 108 EC 3SB64564 14E RXS50J2V1B RKS50J2V1B Shinri Sada Manager Quality Control Department DAIKIN TCF 015 N4 09 2010 KEMA Quality B...

Page 4: ...ls If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refrigerant comes into contact with fire After completing installation check for refrige...

Page 5: ...8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since drain flows out of the outdoor unit do not place under the unit a...

Page 6: ...ntres 580mm 120mm From unit s side Max allowable height Min allowable length Max allowable length 30m 1 5m 20m Liquid pipe Gas pipe O D 6 4mm O D 12 7mm 20g m Additional refrigerant required for refri...

Page 7: ...door Unit Installation 1 Installing outdoor unit 1 When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Drawings 2 If drain work is necess...

Page 8: ...ng the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torque wrenches...

Page 9: ...p valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping an...

Page 10: ...ensions as below Use separate thermal insulation pipes for gas and liquid refrigerant pipes Gas side Liquid side Gas pipe thermal insulation Liquid pipe thermal insulation O D 12 7mm O D 6 4mm I D 14...

Page 11: ...tart Forced cooling operation will stop automatically after around 15 minutes To force a trial operation to stop press the forced operation switch SW1 Facility Setting Switch cooling only model coolin...

Page 12: ...e limits for harmonic currents produced by equipment connected to public low voltage systems with input current 16 A and 75 A per phase Observe the notes mentioned following when wiring to the power s...

Page 13: ...protection the system disables restart operation for 3 minutes after it is turned off 1 3 Carry out the test operation in accordance with the operation manual to ensure that all functions and parts s...

Page 14: ...1101 HT 3P254362 2C M09B391 Two dimensional bar code is a code for manufacturing 00_CV_3P254362 2C fm Page 2 Thursday November 11 2010 1 09 PM...

Reviews: