
SiBE041012
Outdoor Unit
Removal Procedure
155
2.2
Removal of Electrical Box
Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Step
Procedure
Points
1. Remove the electrical
box.
Preparation
Remove the panels and
disconnect the connector for
the fan motor according to
the “Removal of Outer
Panels / Fan Motor”.
1
Disconnect the
connector for the
overload protector
[S40].
2
Disconnect the
connector for the four
way valve coil [S80].
3
Disconnect the 2
connectors for the
reactor.
(R11846)
[S40]
(R11848)
[S80]
(R11844)