Installation manual
R32 split series
English
RXF50A2V1BRXF60A2V1B
Page 1: ...Installation manual R32 split series English Installation manual R32 split series RXF50A2V1B RXF60A2V1B...
Page 2: ...izate n conformitate cu instruc iunile noastre skladni z naslednjimi standardi in drugimi normativi pod pogojem da se uporabljajo v skladu z na imi navodili on vastavuses j rgmis t e standardi te ga v...
Page 3: ...vat muutettuina v platn m zn n Smjernice kako je izmijenjeno ir nyelv ek s m dos t saik rendelkez seit z p niejszymi poprawkami 18 19 20 21 22 23 24 25 Directivelor cu amendamentele respective Direkti...
Page 4: ...ava kyll stysl mp tila M C Kylm aine N Varmuuspainelaitteen asetus P bar Valmistusnumero ja valmistusvuosi katso mallin nimikilpi Maxim ln p pustn tlak PS K bar Minim ln maxim ln p pustn teplota TS TS...
Page 5: ...the electrical wiring 12 4 6 2 Specifications of standard wiring components 12 4 6 3 To connect the electrical wiring on the outdoor unit 12 4 7 Finishing the outdoor unit installation 12 4 7 1 To fin...
Page 6: ...ient place for carrying the unit in and out of the site Choose a location where the hot cold air discharged from the unit or the operation noise will NOT disturb anyone Provide sufficient space around...
Page 7: ...3 2 Preparing refrigerant piping 3 2 1 Refrigerant piping requirements Piping material Phosphoric acid deoxidised seamless copper Piping diameter Liquid piping 6 4 mm 1 4 Gas piping 12 7 mm 1 2 Piping...
Page 8: ...ee space below the unit Additionally make sure the unit is positioned at least 100 mm above the maximum expected level of snow In this case it is recommended to construct a pedestal 330 5 8 0 2 4 0 2...
Page 9: ...unit to prevent the cable from scratching the paint field supply 4 Attach the cable s ends Tighten those ends 4 3 Connecting the refrigerant piping DANGER RISK OF BURNING 4 3 1 About connecting the re...
Page 10: ...old pressure of 0 1 MPa 1 bar 4 After turning the pump OFF check the pressure for at least 1 hour 5 If you do NOT reach the target vacuum or CANNOT maintain the vacuum for 1 hour do the following Chec...
Page 11: ...NFORMATION Piping length is the one way length of liquid piping 4 5 4 To determine the complete recharge amount INFORMATION If a complete recharge is necessary the total refrigerant charge is the fact...
Page 12: ...lation Interconnection cable indoor outdoor 4 core cable 1 5 mm and applicable for 220 240 V Recommended field fuse 15 A Earth leakage circuit breaker MUST comply with applicable legislation 4 6 3 To...
Page 13: ...F INFORMATION Even if the unit is turned OFF it consumes electricity When the power turns back on after a power break the previously selected mode will be resumed 5 4 Starting up the outdoor unit See...
Page 14: ...t ON OFF switch if present on the indoor unit using the indoor unit user interface Method 1 Using the indoor unit ON OFF switch 1 Press the ON OFF switch for at least 5 seconds Result Operation will s...
Page 15: ...REAKER AC CN E HA HE HL HN HR MR _A MR _B S U V W X A K R_ CONNECTION CONNECTOR Q L OVERLOAD PROTECTOR D V D DIODE Q M THERMOSWITCH DB DIODEBRIDGE R RESISTOR DS DIP SWITCH R T THERMISTOR E H HEATER RC...
Page 16: ...3 2017 11 7 2 Piping diagram 7 2 1 Piping diagram Outdoor unit RXF60A2V1B PED categories of equipment High pressure switches category IV Compressor category II Other art 4 3 equipment Note When the hi...
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ...3P512025 3 2017 11 Copyright 2017 Daikin...