background image

8 Finishing the outdoor unit installation

Installation manual

11

RXF20~42C5V1B
Daikin room air conditioner
3P519299-10S – 2020.08

4

Tighten  the  terminal  screws  securely.  We  recommend  using  a
Phillips screwdriver.

8

Finishing the outdoor unit
installation

8.1

To finish the outdoor unit
installation

1

Insulate and fix the refrigerant piping and cables as follows:

g

b

a

f

e

c

d

a

Gas pipe

b

Gas pipe insulation

c

Interconnection cable

d

Field wiring (if applicable)

e

Liquid pipe

f

Liquid pipe insulation

g

Finishing tape

2

Install the service cover.

8.2

To close the outdoor unit

NOTICE

When  closing  the  outdoor  unit  cover,  make  sure  that  the
tightening torque does NOT exceed 1.3 N•m.

2

1

1

9

Commissioning

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

9.1

Checklist before commissioning

After  the  installation  of  the  unit,  first  check  the  items  listed  below.
Once all checks are fulfilled, the unit must be closed. Power-up the
unit after it is closed.

The 

indoor unit

 is properly mounted.

The 

outdoor unit

 is properly mounted.

The  system  is  properly 

earthed

  and  the  earth  terminals

are tightened.

The 

power  supply  voltage

  matches  the  voltage  on  the

identification label of the unit.

There  are  NO 

loose  connections

  or  damaged  electrical

components in the switch box.

There  are  NO 

damaged  components

  or 

squeezed

pipes

 on the inside of the indoor and outdoor units.

There are NO 

refrigerant leaks

.

The 

refrigerant  pipes

  (gas  and  liquid)  are  thermally

insulated.

The  correct  pipe  size  is  installed  and  the 

pipes

  are

properly insulated.

The 

stop valves

 (gas and liquid) on the outdoor unit are

fully open.

The following 

field wiring

 has been carried out according

to  this  document  and  the  applicable  legislation  between
the outdoor unit and the indoor unit.

Drainage

Make sure drainage flows smoothly.

Possible consequence: 

Condensate water might drip.

The indoor unit receives the signals of the 

user interface

.

The  specified  wires  are  used  for  the 

interconnection

cable

.

The 

fuses, circuit breakers,

 or locally installed protection

devices  are  installed  according  to  this  document,  and
have NOT been bypassed.

9.2

Checklist during commissioning

To perform an 

air purge

.

To perform a 

test run

.

9.3

To perform a test run

Prerequisite: 

Power supply MUST be in the specified range.

Prerequisite: 

Test  run  may  be  performed  in  cooling  or  heating

mode.

Prerequisite: 

Test run should be performed in accordance with the

operation  manual  of  the  indoor  unit  to  make  sure  that  all  functions
and parts are working properly.

1

In  cooling  mode,  select  the  lowest  programmable  temperature.
In heating mode, select the highest programmable temperature.
Test run can be disabled if necessary.

2

When  the  test  run  is  finished,  set  the  temperature  to  a  normal
level. In cooling mode: 26~28°C, in heating mode: 20~24°C.

3

The  system  stops  operating  3  minutes  after  the  unit  is  turned
OFF.

Summary of Contents for RXF20C5V1B

Page 1: ...Installation manual Daikin room air conditioner English Installation manual Daikin room air conditioner RXF20C5V1B RXF25C5V1B RXF35C5V1B RXF42C5V1B...

Page 2: ...jem da se uporabljajo v skladu z na imi navodili on vastavuses j rgmis t e standardi te ga v i teiste normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele atitinka emiau nurodyt...

Page 3: ...2 11 Disposal 12 12 Technical data 13 12 1 Wiring diagram 13 12 1 1 Unified wiring diagram legend 13 12 2 Piping diagram 15 12 2 1 Piping diagram Outdoor unit 15 1 About the documentation 1 1 About th...

Page 4: ...kage CAUTION Do NOT open the valves before flaring is complete This would cause refrigerant gas leakage DANGER RISK OF EXPLOSION Do NOT start the unit if it is vacuumed Charging refrigerant see 6 Char...

Page 5: ...al components before servicing The voltage MUST be less than 50 V DC before you can touch electrical components For the location of the terminals see the wiring diagram Finishing indoor unit installat...

Page 6: ...install the outdoor unit with the air inlet facing the wall and NOT directly exposed to the wind b a b c a Baffle plate b Prevailing wind direction c Air outlet 4 1 2 Additional installation site requ...

Page 7: ...bles and the outdoor unit to prevent the cables from scratching the paint field supply 4 Attach the ends of the cables 5 Tighten the cables 5 Piping installation 5 1 Preparing refrigerant piping 5 1 1...

Page 8: ...iping length Keep field piping as short as possible Piping protection Protect the field piping against physical damage 1 Connect the liquid refrigerant connection from the indoor unit to the liquid st...

Page 9: ...ch refrigerant to charge 2 Charging refrigerant 3 Filling in the fluorinated greenhouse gases label and fixing it to the inside of the outdoor unit 6 2 About the refrigerant This product contains fluo...

Page 10: ...e outdoor unit near the gas and liquid stop valves 7 Electrical installation DANGER RISK OF ELECTROCUTION WARNING All wiring MUST be performed by an authorised electrician and MUST comply with the app...

Page 11: ...NO damaged components or squeezed pipes on the inside of the indoor and outdoor units There are NO refrigerant leaks The refrigerant pipes gas and liquid are thermally insulated The correct pipe size...

Page 12: ...n the unit is not operating the LEDs on the PCB are turned off in order to save power Even when the LEDs are off the terminal block and the PCB may be powered 11 Disposal NOTICE Do NOT try to dismantl...

Page 13: ...D V D Diode DB Diode bridge DS DIP switch E H Heater FU F U for characteristics refer to PCB inside your unit Fuse FG Connector frame ground H Harness H P LED V L Pilot lamp light emitting diode Symbo...

Page 14: ...ion manual 14 RXF20 42C5V1B Daikin room air conditioner 3P519299 10S 2020 08 Symbol Meaning X M Terminal strip block Y E Electronic expansion valve coil Y R Y S Reversing solenoid valve coil Z C Ferri...

Page 15: ...T 9 5CuT M 6 4CuT 6 4CuT 4 8CuT 6 4CuT 9 5CuT 9 5CuT 9 5CuT 9 5CuT 9 5CuT 7 9CuT Propeller fan 9 5CuT 9 5CuT HPS 7 0CuT g2 g1 f f c a b d j l k g3 i e RXF20C RXF25C RXF35C ARXF20C ARXF25C ARXF35C h 7...

Page 16: ...ield piping i 4 way valve ON heating c Liquid stop valve j Muffler d Gas stop valve k Compressor e Electronic expansion valve l Accumulator f Muffler with filter HPS High pressure switch automatic res...

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ...ANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe 3P519299 10S 2020 08 Copyright 2...

Reviews: