background image

6 Charging refrigerant

Installation manual

9

RXF20~42C5V1B
Daikin room air conditioner
3P519299-10S – 2020.08

▪ Check for leaks again.
▪ Perform vacuum drying again.

NOTICE

Make  sure  to  open  the  stop  valves  after  installing  the
refrigerant  piping  and  performing  vacuum  drying.  Running
the  system  with  the  stop  valves  closed  may  break  the
compressor.

6

Charging refrigerant

6.1

About charging refrigerant

The  outdoor  unit  is  factory  charged  with  refrigerant,  but  in  some
cases the following might be necessary:

What

When

Charging additional refrigerant

When the total liquid piping
length is more than specified
(see later).

Completely recharging refrigerant

Example: 

▪ When relocating the system.

▪ After a leak.

Charging additional refrigerant

Before  charging  additional  refrigerant,  make  sure  the  outdoor  unit's

external

 refrigerant piping is checked (leak test, vacuum drying).

INFORMATION

Depending on the units and/or the installation conditions, it
might be necessary to connect electrical wiring before you
can charge refrigerant.

Typical  workflow  –  Charging  additional  refrigerant  typically  consists
of the following stages:

1 Determining if and how much you have to charge additionally.

2 If necessary, charging additional refrigerant.

3 Filling in the fluorinated greenhouse gases label, and fixing it to

the inside of the outdoor unit.

Completely recharging refrigerant

Before completely recharging refrigerant, make sure the following is
done:

1 All refrigerant is recovered from the system.

2 The outdoor unit's 

external

 refrigerant piping is checked (leak

test, vacuum drying).

3 Vacuum drying on the outdoor unit's 

internal

 refrigerant piping is

performed.

NOTICE

Before  completely  recharging,  perform  vacuum  drying  on
the outdoor unit's 

internal

 refrigerant piping as well.

Typical  workflow  –  Completely  recharging  refrigerant  typically
consists of the following stages:

1 Determining how much refrigerant to charge.

2 Charging refrigerant.

3 Filling in the fluorinated greenhouse gases label, and fixing it to

the inside of the outdoor unit.

6.2

About the refrigerant

This  product  contains  fluorinated  greenhouse  gases.  Do  NOT  vent
gases into the atmosphere.

Refrigerant type: R32

Global warming potential (GWP) value: 675

NOTICE

Applicable  legislation  on 

fluorinated  greenhouse  gases

requires  that  the  refrigerant  charge  of  the  unit  is  indicated
both in weight and CO

2

 equivalent.

Formula  to  calculate  the  quantity  in  CO

2

  equivalent

tonnes:

  GWP  value  of  the  refrigerant  ×  total  refrigerant

charge [in kg] / 1000

Please contact your installer for more information.

WARNING

The  appliance  shall  be  stored  in  a  room  without
continuously  operating  ignition  sources  (example:  open
flames, an operating gas appliance or an operating electric
heater).

WARNING

▪ Do NOT pierce or burn refrigerant cycle parts.

▪ Do NOT use cleaning materials or means to accelerate

the  defrosting  process  other  than  those  recommended
by the manufacturer.

▪ Be  aware  that  the  refrigerant  inside  the  system  is

odourless.

WARNING

The  refrigerant  inside  the  unit  is  mildly  flammable,  but
normally  does  NOT  leak.  If  the  refrigerant  leaks  in  the
room  and  comes  in  contact  with  fire  from  a  burner,  a
heater, or a cooker, this may result in fire, or the formation
of a harmful gas.

Turn  off  any  combustible  heating  devices,  ventilate  the
room,  and  contact  the  dealer  where  you  purchased  the
unit.

Do  NOT  use  the  unit  until  a  service  person  confirms  that
the  part  from  which  the  refrigerant  leaked  has  been
repaired.

6.3

To determine the additional
refrigerant amount

If the total liquid

piping length is…

Then…

≤10 m

Do NOT add additional refrigerant.

>10 m

R=(total length (m) of liquid
piping⁠–⁠10 m)×0.020

R=Additional charge (kg) (rounded in units
of 0.01 kg)

INFORMATION

Piping length is the one-way length of liquid piping.

6.4

To determine the complete
recharge amount

INFORMATION

If  a  complete  recharge  is  necessary,  the  total  refrigerant
charge  is:  the  factory  refrigerant  charge  (see  unit  name
plate) + the determined additional amount.

Summary of Contents for RXF20C5V1B

Page 1: ...Installation manual Daikin room air conditioner English Installation manual Daikin room air conditioner RXF20C5V1B RXF25C5V1B RXF35C5V1B RXF42C5V1B...

Page 2: ...jem da se uporabljajo v skladu z na imi navodili on vastavuses j rgmis t e standardi te ga v i teiste normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele atitinka emiau nurodyt...

Page 3: ...2 11 Disposal 12 12 Technical data 13 12 1 Wiring diagram 13 12 1 1 Unified wiring diagram legend 13 12 2 Piping diagram 15 12 2 1 Piping diagram Outdoor unit 15 1 About the documentation 1 1 About th...

Page 4: ...kage CAUTION Do NOT open the valves before flaring is complete This would cause refrigerant gas leakage DANGER RISK OF EXPLOSION Do NOT start the unit if it is vacuumed Charging refrigerant see 6 Char...

Page 5: ...al components before servicing The voltage MUST be less than 50 V DC before you can touch electrical components For the location of the terminals see the wiring diagram Finishing indoor unit installat...

Page 6: ...install the outdoor unit with the air inlet facing the wall and NOT directly exposed to the wind b a b c a Baffle plate b Prevailing wind direction c Air outlet 4 1 2 Additional installation site requ...

Page 7: ...bles and the outdoor unit to prevent the cables from scratching the paint field supply 4 Attach the ends of the cables 5 Tighten the cables 5 Piping installation 5 1 Preparing refrigerant piping 5 1 1...

Page 8: ...iping length Keep field piping as short as possible Piping protection Protect the field piping against physical damage 1 Connect the liquid refrigerant connection from the indoor unit to the liquid st...

Page 9: ...ch refrigerant to charge 2 Charging refrigerant 3 Filling in the fluorinated greenhouse gases label and fixing it to the inside of the outdoor unit 6 2 About the refrigerant This product contains fluo...

Page 10: ...e outdoor unit near the gas and liquid stop valves 7 Electrical installation DANGER RISK OF ELECTROCUTION WARNING All wiring MUST be performed by an authorised electrician and MUST comply with the app...

Page 11: ...NO damaged components or squeezed pipes on the inside of the indoor and outdoor units There are NO refrigerant leaks The refrigerant pipes gas and liquid are thermally insulated The correct pipe size...

Page 12: ...n the unit is not operating the LEDs on the PCB are turned off in order to save power Even when the LEDs are off the terminal block and the PCB may be powered 11 Disposal NOTICE Do NOT try to dismantl...

Page 13: ...D V D Diode DB Diode bridge DS DIP switch E H Heater FU F U for characteristics refer to PCB inside your unit Fuse FG Connector frame ground H Harness H P LED V L Pilot lamp light emitting diode Symbo...

Page 14: ...ion manual 14 RXF20 42C5V1B Daikin room air conditioner 3P519299 10S 2020 08 Symbol Meaning X M Terminal strip block Y E Electronic expansion valve coil Y R Y S Reversing solenoid valve coil Z C Ferri...

Page 15: ...T 9 5CuT M 6 4CuT 6 4CuT 4 8CuT 6 4CuT 9 5CuT 9 5CuT 9 5CuT 9 5CuT 9 5CuT 7 9CuT Propeller fan 9 5CuT 9 5CuT HPS 7 0CuT g2 g1 f f c a b d j l k g3 i e RXF20C RXF25C RXF35C ARXF20C ARXF25C ARXF35C h 7...

Page 16: ...ield piping i 4 way valve ON heating c Liquid stop valve j Muffler d Gas stop valve k Compressor e Electronic expansion valve l Accumulator f Muffler with filter HPS High pressure switch automatic res...

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ...ANBUL T RK YE Tel 0216 453 27 00 Faks 0216 671 06 00 a r Merkezi 444 999 0 Web www daikin com tr G lsuyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe 3P519299 10S 2020 08 Copyright 2...

Reviews: