CAUTION

When connecting the connection wires to the terminal board using a single core 
wire, be sure to perform curling. 
Problems with the work may cause heat and fires.  

3) Pull the wire and make sure that it does not disconnect. Then fix the wire in place with a wire stop.

Test Run and Final Check

1.

Trial Operation and Testing

1-1 Measure the supply voltage and make sure that it falls in the specified range.
1-2 Trial operation should be carried out in either cooling or heating mode.

For Heat pump

• In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable temperature.

1) Trial operation may be disabled in either mode depending on the room temperature.
2) After trial operation is complete, set the temperature to a normal level (26C

°

 to 28

°

C in cooling mode, 20

°

C to 24

°

C in 

heating mode).

3) For protection, the system disables restart operation for 3 minutes after it is turned off.

For Cooling only

• Select the lowest programmable temperature.

1) Trial operation in cooling mode may be disabled depending on the room temperature.
2) After trial operation is complete, set the temperature to a normal level (26

°

C to 28

°

C).

3) For protection, the unit disables restart operation for 3 minutes after it is turned off.

1-3 Carry out the test operation in accordance with the Operation Manual to ensure that all functions and parts, 

such as louver movement, are working properly.

• The air conditioner requires a small amount of power in its standby mode.  If the system is not to be used for some 

time after installation, shut off the circuit breaker to eliminate unnecessary power consumption.

• If the circuit breaker trips to shut off the power to the air conditioner, the system will restore the original operation 

mode when the circuit breaker is opened again.

2.

Test Items 

Test Items

Symptom

Check

Indoor and outdoor units are installed properly on solid bases.

Fall, vibration, noise

No refrigerant gas leaks.

Incomplete cooling/heating function

Refrigerant gas and liquid pipes and indoor drain hose extension are 
thermally insulated.

Water leakage

Draining line is properly installed.

Water leakage

System is properly earthed.

Electrical leakage

The specified wires are used for interconnecting wire connections.

Inoperative or burn damage

Indoor or outdoor unit’s air intake or exhaust has clear path of air.
Stop valves are opened.

Incomplete cooling/heating 
function

Indoor unit properly receives remote control commands.

Inoperative

 Stripping wire at terminal block

3PEN188780-2R.book  Page 10  Wednesday, March 16, 2016  3:46 PM

Summary of Contents for RKS71FAV1B

Page 1: ...INSTALLATION MANUAL R410A Split Series Models RXS71FAV1B8 RKS71FAV1B RX71GV1B8 RKS71FV1B RXS71FAV1B9 RX71GV1B9 RXS71FAV1B RXS71FV1B RX71GV1B 3PEN188780 2R book Page 1 Wednesday March 16 2016 3 46 PM...

Page 2: ...ompatibility 2004 108 EC 3SB64526 7F Shinri Sada Manager Quality Control Department 25th of Nov 2009 DAIKIN TCF 015 M18 11 2009 RXS71FV1B RKS71FV1B RXS71FAV1B RKS71FAV1B RX71GV1B KEMA Quality B V 7473...

Page 3: ...2 DEKRA Certification B V NB0344 74736 KRQ EMC97 4957 6 Shinri Sada Manager Quality Control Department RXS71FAV1B9 RX71GV1B9 Machinery 2006 42 EC Electromagnetic Compatibility 2004 108 EC Low Voltage...

Page 4: ...vamente por B de acuerdo con el Certificado C 06 Nota delineato nel A e giudicato positivamente da B secondo il Certificato C 07 A B C 08 Nota tal como estabelecido em A e com o parecer positivo de B...

Page 5: ...3SB65451 4 fm Page 2 Thursday October 27 2011 4 49 PM 3PEN188780 2R book Page 4 Wednesday March 16 2016 3 46 PM...

Page 6: ...als If refrigerant gas leaks during installation ventilate the area immediately Toxic gas may be produced if the refrigerant comes into contact with fire After completing installation check for refrig...

Page 7: ...may shorten the life of the air conditioner 9 Since drain flows out of the outdoor unit do not place under the unit anything which must be kept away from moisture NOTE Cannot be installed hanging fro...

Page 8: ...noise and vibration may occur depending on how the unit is installed and the environment in which it is used 25cm from wall Right side plate 35cm Foot bolt hole centres Foot bolt hole centres 62cm CA...

Page 9: ...g drain hole Drain socket A into drain hole and drain caps B into drain hole and After insertion turn them about 40 clockwise NOTE Check that the drain receiver C is correctly engaged with the project...

Page 10: ...en tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them fully with the torqu...

Page 11: ...valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequently requires no operation 3 Do vacuum pumping and...

Page 12: ...ow Use separate thermal insulation pipes for gas and liquid refrigerant pipes Gas side Liquid side Gas pipe thermal insulation Liquid pipe ther mal insulation O D 15 9mm O D 6 4mm I D 16 20mm I D 8 10...

Page 13: ...a human 1 You can expand the operation range to 15 C by turning on switch B SW4 on the PCB If the outdoor temperature falls to 20 C or lower the operation will stop If the outdoor temperature rises t...

Page 14: ...nternational Technical Standard setting the limits for harmonic currents produced by equipment connected to public low voltage systems with input current 16 A and 75 A per phase Observe the notes ment...

Page 15: ...ection the unit disables restart operation for 3 minutes after it is turned off 1 3 Carry out the test operation in accordance with the Operation Manual to ensure that all functions and parts such as...

Page 16: ...1603 HT 3P188780 2R M12B051C Two dimensional bar code is a code for manufacturing 3PEN188780 2R book Page 1 Wednesday March 16 2016 3 46 PM...

Reviews: