![background image](http://html1.mh-extra.com/html/daikin/rkm46pvma/rkm46pvma_service-manual_2459839009.webp)
Si001421EA
Electrical Box
Removal Procedure
7
6
7
8
Remove the 7 screws
and detach the
connecting wire and the
power supply wire.
Remove the 4 screws
and detach the demand
communication wire.
Remove the screw and
detach the earth /
ground wire.
When reassembling, fasten
the demand communication
wire with the clamp to the
wire fixture.
Some models have no
demand communication
wire.
9
Pull out the outdoor
temperature thermistor
from the protection net
and the groove.
When reassembling, pass
the thermistor harness
through between the heat
exchanger pipes as below.
10
Remove the 4 screws
and remove the right
side panel.
Step
Procedure
Points
Earth /
ground
screw
Power
supply
wire
Connecting wire
Demand communication wire
(R21387)
Clamp
(R21388)
Outdoor
temperature
thermistor
Protection
net
Groove
(R22537)
Thermistor
harness
Heat exchanger pipe
(R21390)
Right side panel
(R21391)