![background image](http://html1.mh-extra.com/html/daikin/rdt/rdt_installation-and-maintenance-manual_3350001149.webp)
r
oofToP
e
quIPMenT
W
arranTy
r
egIsTraTIon
f
orM
www.DaikinApplied.com 149
IM 893-10 • ROOFPAK SINGLEZONE UNITS
126
Daikin
IM 893-4
Rooftop Equipment Warranty Regist . Form
Warranty Registration Form (continued)
E. Ambient temperature ______________________ °F
F. Compressor lockout timers function? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No N/A
G. Does unit start up and perform per sequence of operation?. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No N/A
IV . PERFORMANCE DATA
A. Compressor voltage across each phase:
L1–2 ________ V
L2–3 ________ V L1–3 _______ V
B. Compressor amperage of fully loaded compressor:
Compressor #1:
Phase 1 ________ Phase 2 ________ Phase 3 ________
Compressor #2:
Phase 1 ________ Phase 2 ________ Phase 3 ________
Compressor #3:
Phase 1 ________ Phase 2 ________ Phase 3 ________
Compressor #4:
Phase 1 ________ Phase 2 ________ Phase 3 ________
Compressor #5:
Phase 1 ________ Phase 2 ________ Phase 3 ________
Compressor #6:
Phase 1 ________ Phase 2 ________ Phase 3 ________
C. Low pressure cut-out:
Circuit 1 _________ psig
Circuit 2 _________ psig
Low pressure cut-in:
Circuit 1 _________ psig
Circuit 2 _________ psig
D. High pressure cut-out:
Circuit 1 _________ psig
Circuit 2 _________ psig
E. Discharge pressure, one compressor:
Circuit 1 _________ psig
Circuit 2 _________ psig
Discharge pressure, fully loaded, 2–3 compressors:
Circuit 1 _________ psig
Circuit 2 _________ psig_
F. Suction pressure, one compressor:
Circuit 1 _________ psig
Circuit 2 _________ psig
Suction pressure, fully loaded, 2–3 compressors:
Circuit 1 _________ psig
Circuit 2 _________ psig
Liquid press, fully loaded, 2–3 compressors
(at liquid line shutoff valve):
Circuit 1 _________ psig
Circuit 2 _________ psig
Liquid temperature, fully loaded, 2–3 compressors:
Circuit 1 _________ psig
Circuit 2 _________ psig
G. Suction line temperature:
Circuit 1
____________°F
Circuit 2
___________ °F
H. Superheat:
____________°F
___________ °F
I. Subcooling:
____________°F
___________ °F
J. Is the liquid in the liquid line sightglass clear and dry? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No N/A
K. Does the hot gas bypass valve function properly? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No N/A
L. At what suction pressure does HGBP valve open?
Circuit 1 _________ psig
Circuit 2 _________ psig
M. Record discharge air temperature at discharge of unit:
___________ °F
N. Are all control lines secure to prevent excessive vibration and wear? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No N/A
O. Are all gauges shut off and valve caps and packings tight after start-up? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No N/A
V . ELECTRIC HEAT CHECK, TEST & START
A. Electrical heat service corresponds to unit nameplate? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No N/A
_________ Volts
_________ Hertz
________ Phase
B. Are there any signs of physical damage to the electric heat coils? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No N/A
C. Have all electrical terminals been tightened? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No N/A
D. Does sequence controller stage contactors properly? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Yes No N/A
E. Electric heater voltage across each phase:
L1–2 ________ V
L2–3 ________ V L1–3 _______ V
F. Amp draw across each phase at each heating stage:
Stage 1
Stage 2
Stage 3
Stage 4
Stage 5
Stage 6
Phase L1:
___________
____________
____________
___________
___________
____________
Phase L2:
___________
____________
____________
___________
___________
____________
Phase L3
___________
____________
____________
___________
___________
____________
G. FLA:
L1 ___________
L2____________
L3 ___________
H. Operate electric heat with fans off. Electric heat must cycle OFF on high limit control. . . . . . . . . . . . . . . . . . . . . . . . . . Yes No N/A