![background image](http://html1.mh-extra.com/html/daikin/rdt/rdt_installation-and-maintenance-manual_3350001027.webp)
M
eChanICal
I
nsTallaTIon
www.DaikinApplied.com 27
IM 893-10 • ROOFPAK SINGLEZONE UNITS
Phase II . Reassemble cabinet (Figure 31)
1. Reinstall top cap removed in Phase I, Step 1.
2. Caulk (watertight) ends of splice cap.
3. Caulk (watertight) vertical seam.
4. Install #10 screws (provided).
5. Install screws (0.25–20 × 0.75) removed in Phase I,
Step 2
6. Install splice cover (provided).
Figure 32: Reassemble Cabinet
Reinstall top cap
saved in step 1
Caulk ends
of splice cap
See detail
Splice cover,
provided
#10 screws,
provided
Nut clip-on,
provided
Caulk
vertical
seam
Install screws
(.25 to 20 × .75)
saved from step 1