![background image](http://html.mh-extra.com/html/daikin/im-1068-2/im-1068-2_installation-and-maintenance-data_2460230005.webp)
IM 1068-2 / Page 5 of 28
Installation
Wall Opening Requirements
Before installing the unit, check the wall opening to be sure
the wall sleeve will slide in unobstructed. The rough opening
should measure 25'' × 36½'' (635mm × 927mm) indoors and
14½" × 36½" (368mm x 927mm) outdoors for sizes 007–014
as shown below. The wall box is designed to be mounted
on the floor but may be located above the floor line to clear
obstructions. Without cabinet modifications, the wall box
can be placed up to 1'' (25mm) above the floor. The standard
adjustable kickplate can be telescoped to hide the space below
the wall box. Complete wall box installation instructions can
found on
page 6
.
CAUTION
Sheet metal parts, self-tapping screws, clips and such items in-
herently have sharp edges, and it is necessary that the installer
exercise caution. This equipment is to be installed only by an
experienced installation company which employs trained personnel.
Figure 2: Unit and Wall Box Opening Dimensions
E
L
C
M
J
K
H
A
D
F
G
B
Table 1: Dimensions
Unit Size
A
B
C
D
E
F
G
H
J
K
L
M
007-014
in.
48
2½ Min.
7¼ Min.
36¼
5¾
24½
13
11
⁄
16
21
3½-5½ Adj.
1¾
8
1
mm
1219
64 Min.
184 Min.
921
146
648
348
533
89-140 Adj.
44
203
25
Summary of Contents for IM 1068-2
Page 26: ...IM 1068 2 Page 26 of 28 ...
Page 27: ...IM 1068 2 Page 27 of 28 ...