![background image](http://html.mh-extra.com/html/daikin/fxfq-p/fxfq-p_engineeiring-data_2459699030.webp)
EDUS391000-F1
Installation
FXFQ-P
29
3P161684-5H
English
15
WHEN ELECTRIC WIRING WORK IS FINISHED
•
Add approximately 1/4gal. of water slowly from the air outlet and check drainage flow.
•
Check drainage flow during COOL running, explained under ‘‘12. TEST OPERATION’’.
•
Refer to the figure on the following after checking the draining of water, and mount the thermal insulation
material for drainage (14) and thermal insulate the drain socket.
WHEN ELECTRIC WIRING WORK IS NOT FINISHED
CAUTION
•
Electrical wiring work should be done by a certified electrician.
•
If someone who does not have the proper qualifications performs the work, perform the following after the
test run is complete.
•
Remove the control box lid. Connect the single phase power supply (SINGLE PHASE 60Hz 208/230V) to
connections L
1
and L
2
on the terminal block for wiring the units. Connect the ground wire firmly. When car-
rying out wiring work around the control box, make sure none of the connectors come undone. Be sure to
attach the control box lid before turning on the power.
•
Put approximately 1/4gal. of water into the drain pan through the blow-off mouth on the left-hand side of the
drain socket. Make sure not to pour water over the drain pump or any electric parts including those of the
drain pump.
•
When the power is turned on, the drain pump will operate and you can check the draining of water through
the transparent part of the drain socket. (The drain pump will stop automatically in 10 minutes.)
After checking the draining of water, mount the thermal insulation material for drainage (14) and thermal
insulate the drain socket.
•
After confirming drainage
(Fig. 23, Fig. 24)
, turn off the power and remove the power supply.
•
Attach the control box lid as before.
Th
erma
l
ins
ul
a
t
i
o
n
ma
t
eria
l fo
r
drainage
(14)
(
a
cc
ess
o
r
y)
Sea
l
ing
p
ad
(L
arge
) (10)
Th
erma
l
ins
ul
a
t
i
o
n
ma
t
eria
l fo
r
drainage
(14)
(
a
cc
ess
o
r
y)
Ma
k
e
s
u
re
th
a
t th
ere
is
n
o cl
earan
c
e.
B
e
s
u
re
to l
a
y th
e
sea
l
ing
ma
t
eria
l o
n
(14)
.
A
t l
eas
t
4
in.
Pl
as
t
i
c
wa
t
ering
c
an
(Tu
be
s
houl
d
be
ab
out 4
in.
lo
ng.
)
(Ch
e
ck th
e
drainage
n
o
w.
)
Ser
v
i
c
e
drain
outl
e
t (
wi
th
r
u
bber
plu
g
)
(U
se
th
is
outl
e
t to
drain
wa
t
er
f
r
o
m
th
e
drain
p
an.
)
D
rain
s
ock
e
t
s
<
Adding
wa
t
er
th
r
ou
g
h
air
dis
ch
arge
outl
e
t>
[
Me
tho
d
of
adding
wa
t
er
]
F
i
g
.
2
3
D
rain
pu
m
p
loc
a
t
i
o
n