![Daikin FXFQ-P Engineeiring Data Download Page 38](http://html.mh-extra.com/html/daikin/fxfq-p/fxfq-p_engineeiring-data_2459699038.webp)
EDUS391000-F1
Installation
FXFQ-P
37
3P161684-5H
English
23
Wiring Method
(See ‘‘ELECTRIC WIRING WORK’’)
(3)
Remove the control box lid
(4) Add remote control 2 (slave) to the terminal block for remote controller (P1, P2) in the control box.
(There is no polarity.) (Refer to Fig. 30 and 8-3.)
9-4 Computerised control (forced off and on/off operation)
(1) Wire specifications and how to perform wiring
•
Connect the input from outside to terminals T1 and T2 of the terminal block for remote controller.
(2) Actuation
•
The following table explains FORCED OFF and ON/OFF OPERATIONS in response to Input A.
(3) How to select FORCED OFF and ON/OFF OPERATION
•
Turn the power on and then use the remote controller to select operation.
9-5 Centralized control
•
For centralized control, it is necessary to designate the group No. For details, refer to the manual of each
optional controllers for centralized control.
Wire specification
CONDUCTORSTRANDEDNONSHIELDEDCOPPERCABLE06#ORVINYLJACKET
Gauge
AWG18
Length
Max.
ft.
External terminal
Contact that can ensure the minimum applicable load of 15 V DC, 1 mA.
FORCED OFF
ON/OFF OPERATION
Input “ON” stops operation (impossible by remote controllers.) Input OFF
→
ON turns ON unit.
Input OFF enables control by remote controller.
Input ON
→
OFF turns OFF unit.
S
M
S
S
M
Rem
ot
e
co
n
t
r
oll
er
PC
b
o
ard
(F
a
cto
r
y
se
tt
ing
)
F
i
g
.
33
O
n
ly o
ne
rem
ot
e
co
n
t
r
oll
er
needs
to
be
ch
anged
i
f f
a
cto
r
y
se
tt
ings
h
a
v
e
remained
u
n
to
U
ch
ed.
F2
T1
T2
FO
R
CED
OFF
I
n
put
A