![background image](http://html1.mh-extra.com/html/daikin/fvfc71av16/fvfc71av16_installation-manual_4703914062.webp)
14-2
Packing
❶
•
Cover the unit with polythene
product
cover, then p
ick the unit
up and settle it
down on the
bottom skid(
e
)
as
shown
in
figure
.
❷
•
Put
the cardboard box
(
d
)
upon
the
unit
as shown in figure.
❸
•
Fix the straps
(a)
on the unit
with help of strap
fixing machine (
f
)
as
shown
in figure.
(Use
marked reference for placing
straps)
a)
b)
c)
Strap
Starp
Cutter
Top corrugated
cardboard sheet with
EPS
d
)
Cardboard Box
e
)
Bottom
Skid
•
Put the top corrugated cardboard
sheet and EPS (c) on the top of the
unit as shown in figure.
❹
f
)
Portable strap fixing
machine
60
Summary of Contents for FVFC71AV16
Page 43: ...41...
Page 44: ...42...
Page 45: ...43...
Page 46: ...44...
Page 47: ...45...
Page 48: ...46...
Page 49: ...47 RZVF100BSV16 RZMF140BSV16 RZVF100BSV16 RZMF140BSV16...
Page 50: ...48...
Page 51: ...49...
Page 52: ...50 RZVF100BSV16 RZVF100BSV16 RZMF140BSV16 RZMF140BSV16...
Page 53: ...51 3...
Page 54: ...52 RZVF100BSV16 RZMF140BSV16...
Page 55: ...53 RZVF100BSV16 RZMF140BSV16 RZVF100BSV16 RZMF140BSV16 V V V...
Page 56: ...54...
Page 58: ...56 RZVF100BSV16 RZMF140BSV16...
Page 59: ...57...
Page 60: ...58 RZVF100BSV16 RZMF140BSV16...
Page 63: ......