• Removal and evacuation
When breaking into the refrigerant circuit to make repairs – or for any other purpose – conventional procedures
shall be used. However, it is important that best practice is followed since flammability is a consideration.
The following procedure shall be adhered to:
• remove
refrigerant;
• purge the circuit with inert gas;
• evacuate;
• purge again with inert gas;
• open the circuit by cutting or brazing.
The refrigerant charge shall be recovered into the correct recovery cylinders. The system shall be “flushed”
with OFN to render the unit safe. This process may need to be repeated several times. Compressed air or
oxygen shall not be used for this task. Flushing shall be achieved by breaking the vacuum in the system with
OFN and continuing to fill until the working pressure is achieved, then venting to atmosphere, and finally
pulling down to a vacuum. This process shall be repeated until no refrigerant is within the system. When
the final OFN charge is used, the system shall be vented down to atmospheric pressure to enable work to
take place. This operation is absolutely vital if brazing operations on the pipe-work are to take place. Ensure
that the outlet for the vacuum pump is not close to any ignition sources and there is ventilation available.
• Labelling
This unit shall be labelled ‘de-commissioned and emptied of refrigerant’. This label shall be dated and signed.
Ensure that there are labels on the equipment stating the equipment contains flammable refrigerant.
• Charging procedures
In addition to conventional charging procedures, the following requirements shall be followed.
– Ensure that contamination of different refrigerants does not occur when using charging equipment.
Hoses or lines shall be as short as possible to minimise the amount of refrigerant contained in them.
– Cylinders shall be kept upright.
– Ensure that the refrigeration system is earthed prior to charging the system with refrigerant.
– Label the system when charging is complete (if not already).
– Extreme care shall be taken not to overfill the refrigeration system.
Prior to recharging the system it shall be pressure tested with OFN. The system shall be leak tested on
completion of charging but prior to commissioning. A follow up leak test shall be carried out prior to leaving
the site.
Decommissioning
Before carrying out this procedure, it is essential that the technician is completely familiar with the equipment
and all its detail. It is recommended good practice that all refrigerants are recovered safely. Prior to the task
being carried out, an oil and refrigerant sample shall be taken in case analysis is required prior to re-use of
reclaimed refrigerant. It is essential that electrical power is available before the task is commenced.
a) Become familiar with the equipment and its operation.
b) Isolate system electrically.
c) Before attempting the procedure ensure that:
•
mechanical handling equipment is available, if required, for handling refrigerant cylinders;
•
all personal protective equipment is available and being used correctly;
•
the recovery process is supervised at all times by a competent person;
•
recovery equipment and cylinders conform to the appropriate standards.
d) Pump down refrigerant system, if possible.
e)
If a vacuum is not possible, make a manifold so that refrigerant can be removed from various parts of
the system.
f)
Make sure that cylinder is situated on the scales before recovery takes place.
g) Start the recovery machine and operate in accordance with manufacturer’s instructions.
h) Do not overfill cylinders. (No more than 80 % volume liquid charge).
i)
Do not exceed the maximum working pressure of the cylinder, even temporarily.
j)
When the cylinders have been filled correctly and the process completed, make sure that the cylinders
and the equipment are removed from site promptly and all isolation valves on the equipment are closed off.
k)
Recovered refrigerant shall not be charged into another refrigeration system unless it has been cleaned
and checked.
1-IMOM-FS-FVFC-RZFC-DAIKIN-EN.indd 20
1-IMOM-FS-FVFC-RZFC-DAIKIN-EN.indd 20
5/14/2020 5:54:00 PM
5/14/2020 5:54:00 PM
Summary of Contents for FVFC71AV16
Page 43: ...41...
Page 44: ...42...
Page 45: ...43...
Page 46: ...44...
Page 47: ...45...
Page 48: ...46...
Page 49: ...47 RZVF100BSV16 RZMF140BSV16 RZVF100BSV16 RZMF140BSV16...
Page 50: ...48...
Page 51: ...49...
Page 52: ...50 RZVF100BSV16 RZVF100BSV16 RZMF140BSV16 RZMF140BSV16...
Page 53: ...51 3...
Page 54: ...52 RZVF100BSV16 RZMF140BSV16...
Page 55: ...53 RZVF100BSV16 RZMF140BSV16 RZVF100BSV16 RZMF140BSV16 V V V...
Page 56: ...54...
Page 58: ...56 RZVF100BSV16 RZMF140BSV16...
Page 59: ...57...
Page 60: ...58 RZVF100BSV16 RZMF140BSV16...
Page 63: ......