background image

8 Finishing the indoor unit installation

Installation manual

8

FTXF50~71D5V1B6

Split system air conditioners

3P512025-11Z – 2021.10

b

S21 wire harness routing for other applications

c

S21 connector

3

Put  the  electrical  wiring  box  cover  back  and  pull  the  wire
harness around it as shown in the previous figure.

8

Finishing the indoor unit
installation

8.1

To insulate the drain piping,
refrigerant piping and
interconnection cable

1

After the drain piping, refrigerant piping and the electrical wiring
are finished. Wrap refrigerant piping, interconnection cable and
drain  hose  together  using  insulation  tape.  Overlap  at  least  half
the width of the tape with each turn.

d

e

c

b

f

a

a

Drain hose

b

Interconnection cable

c

Mounting plate (accessory)

d

Refrigerant piping

e

Indoor unit fixing screw M4×12L (accessory)

f

Bottom frame

8.2

To pass the pipes through the wall
hole

1

Shape the refrigerant pipes along the pipe path marking on the
mounting plate.

a

b

c

c

d

e

a

Drain hose

b

Caulk this hole with putty or caulking material

c

Adhesive vinyl tape

d

Insulation tape

e

Mounting plate (accessory)

NOTICE

▪ Do NOT bend refrigerant pipes.

▪ Do  NOT  push  the  refrigerant  pipes  onto  the  bottom

frame or the front grille.

2

Pass the drain hose and refrigerant piping through the wall hole
and seal the gap with a putty.

8.3

To fix the unit on the mounting
plate

1

Set  the  indoor  unit  on  the  mounting  plate  hooks.  Use  the  " "
marks as a guide.

2

Press the bottom frame of the unit with both hands to set it on
the  bottom  hooks  of  the  mounting  plate.  Make  sure  that  the
wires do NOT get squeezed anywhere.

Note: 

  Take  care  that  the  interconnection  cable  does  NOT  get

caught in the indoor unit.

3

Press the bottom edge of the indoor unit with both hands until it
is firmly caught by the mounting plate hooks.

4

Secure the indoor unit to the mounting plate using 2 indoor unit
fixing screws M4×12L (accessory).

9

Commissioning

NOTICE

General 

commissioning 

checklist.

 

Next 

to 

the

commissioning  instructions  in  this  chapter,  a  general
commissioning  checklist  is  also  available  on  the  Daikin
Business Portal (authentication required).

The  general  commissioning  checklist  is  complementary  to
the  instructions  in  this  chapter  and  can  be  used  as  a
guideline and reporting template during the commissioning
and hand-over to the user.

NOTICE

ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.

9.1

Checklist before commissioning

1

After the installation of the unit, check the items listed below.

2

Close the unit.

3

Power up the unit.

You  read  the  complete  installation  instructions,  as
described in the 

installer reference guide

.

The 

indoor units

 are properly mounted.

Summary of Contents for FTXF50D5V1B6

Page 1: ...Installation manual Split system air conditioners English Installation manual Split system air conditioners FTXF50D5V1B6 FTXF60D5V1B6 FTXF71D5V1B6...

Page 2: ...ers INFORMATION This appliance is intended to be used by expert or trained users in shops in light industry and on farms or for commercial and household use by lay persons WARNING Make sure installati...

Page 3: ...ds or connections from a star system They can cause overheating electrical shock or fire Do NOT install a phase advancing capacitor because this unit is equipped with an inverter A phase advancing cap...

Page 4: ...perating gas appliance or an operating electric heater The room size shall be as specified in the General safety precaution 5 1 1 Installation site requirements of the indoor unit INFORMATION The soun...

Page 5: ...TION The factory default is right side piping For left side piping remove the piping from the right side and install it on the left side 1 Attach the drain hose with adhesive vinyl tape to the bottom...

Page 6: ...2 7 mm 1 2 a Depending on the applicable legislation and the maximum working pressure of the unit see PS High on the unit name plate larger piping thickness might be required 6 1 2 Refrigerant piping...

Page 7: ...aller reference guide for opening procedure 3 Pass the interconnection cable from the outdoor unit through the feed through wall hole through the back of the indoor unit and through the front side Not...

Page 8: ...g through the wall hole and seal the gap with a putty 8 3 To fix the unit on the mounting plate 1 Set the indoor unit on the mounting plate hooks Use the marks as a guide 2 Press the bottom frame of t...

Page 9: ...he system stops operating 3 minutes after the unit is turned OFF 9 2 1 To perform a test run in winter season When operating the air conditioner in Cooling mode in winter set it to test run operation...

Page 10: ...tepper motor M C Compressor motor M F Fan motor M P Drain pump motor M S Swing motor MR MRCW MRM MRN Magnetic relay N Neutral n N Number of passes through ferrite core PAM Pulse amplitude modulation P...

Page 11: ......

Page 12: ...suyu Mahallesi Fevzi akmak Caddesi Bur ak Sokak No 20 34848 Maltepe stanbul T RK YE Factory Kargal hanbaba OSB Mahallesi Organize Sanayi 1 Sokak No 28 54300 Hendek Sakarya T RK YE 3P512025 11Z 2021 10...

Reviews: