Tips for Servicing
SiBE041525F
91
Trial Operation and Field Settings
1. Tips for Servicing
1.1
Pump Down Operation
Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing of the unit.
Detail
1) Remove the valve caps from the liquid stop valve and the gas stop valve.
2) Carry out forced cooling operation.
3) After 5 ~ 10 minutes, close the liquid stop valve with a hexagonal wrench.
4) After 2 ~ 3 minutes, close the gas stop valve and stop the forced cooling operation.
Refer to page 91 for forced cooling operation.
1.2
Forced Cooling Operation
Indoor Unit
Gas stop valve
Valve cap
Close
Liquid stop valve
Service port
(R13628)
Hexagonal
wrench
Item
Forced Cooling
Conditions
The forced cooling operation is allowed when both of the following conditions
are met.
1) The outdoor unit is not abnormal and not in the 3-minute standby mode.
2) The outdoor unit is not operating.
Start
Press the forced cooling operation
ON/OFF
button (SW1) on the indoor unit
for 5 seconds.
Command
frequency
20/25/35 class: 58 Hz
50/60/71 class: 30 Hz
End
The forced cooling operation ends when any of the following conditions is
fulfilled.
1) The operation ends automatically after 15 minutes.
2) Press the forced cooling operation
ON/OFF
button (SW1) on the indoor unit
again.
3) Press the
ON/OFF
button on the remote controller.
Others
Protection functions have priority over all other functions during forced cooling
operation.
(R21069)
ON/OFF
ON/OFF
button (SW1)
Summary of Contents for FTX20K2V1B
Page 12: ...SiBE041525F 1 List of Functions Part 1 List of Functions 1 Functions 2...
Page 15: ...SiBE041525F Specifications 4 Part 2 Specifications 1 Specifications 5...
Page 16: ...Specifications SiBE041525F 5 Specifications 1 Specifications See corresponding databook...
Page 51: ...SiBE041525F Remote Controller 40 Part 5 Remote Controller 1 Remote Controller 41...