![background image](http://html1.mh-extra.com/html/daikin/ftnv20jvak/ftnv20jvak_installation-manual_2459378007.webp)
English
5
Unpacking Procedures
IMPORTANT
Wall Mounted Unit
1. After takeoff the bands and pull out one side cushion, push the unit to the opposite side.
•
2. Pull out the unit from the other side.
Outdoor Unit
1. After takeoff the bands, pull out the carton box from the top side of the unit.
•
* This product is not designed for re-packing. In case of re-packing, contact to Daikin Dealer.
1-IM-5WMJ(R)-0714(2)DAIKIN(SASO)5 5
1-IM-5WMJ(R)-0714(2)DAIKIN(SASO)5 5
5/22/15 4:27:16 PM
5/22/15 4:27:16 PM