![background image](http://html1.mh-extra.com/html/daikin/fte09jv2s/fte09jv2s_service-manual_2459324014.webp)
Removal of Electrical Box / PCB / Swing Motor
Si04-960
12
Removal Procedure
6
Control PCB
3. Remove the swing motor
assembly.
1
To remove the swing
motor assembly,
remove the 2 screws.
Step
Procedure
Points
JB
JC
[S1] (Fan motor)
Glass tube fuse 3.15A 250V
(R18642)
[S7]
(Fan motor)
[S6]
(Swing motor)
[S32]
(Indoor heat exchanger thermistor)
JA
(Address)
(R2542)
Swing motor
(R2543)