![background image](http://html1.mh-extra.com/html/daikin/fte09jv2s/fte09jv2s_service-manual_2459324012.webp)
Removal of Electrical Box / PCB / Swing Motor
Si04-960
10
Removal Procedure
2. Remove the printed circuit
board (PCB).
1
Remove the shield
plate.
2
To remove the front
cover of the electrical
box, disengage the
knobs by pushing the 2
hooks at the top and the
bottom.
3
Slide the front cover of
the electrical box to the
left and remove it.
Step
Procedure
Points
(R10736)
Shield plate
(R10737)
Pushing point
Pushing point
Push
(R10738)
Front
cover
(R10739)