![background image](http://html1.mh-extra.com/html/daikin/fte09jv2s/fte09jv2s_service-manual_2459324011.webp)
Si04-960
Removal of Electrical Box / PCB / Swing Motor
Removal Procedure
9
6
Remove the screw on
the terminal board.
The electrical box can be
removed without
disengaging the terminal
board.
7
Remove the screw on
the electrical box.
8
Pull up the electrical
box forward to remove.
A hook is provided on the
behind.
Step
Procedure
Points
(R10733)
Electrical box
(R10734)
(R10735)