6
English
PREPARATION BEFORE INSTALLATION
Support plate
1. Installation of support plate of the control box
• Install the support plate of the control box to
the air conditioner.
Control box
Wire through hole
View
2. Moving the control box
• Remove the control box from the air condi-
tioner and install it to the support plate.
• After removing the control box, please
retighten the screws to their original posi-
tions.
• When moving the control box, do not apply
force to the wiring.
• Tie down any remaining strong current
(motor wiring) to the support plate with wire
clamps.
• Fix any remaining weak current (thermistor
wire, signal wire of motor valve and floating
switch) with wire clamps.
01_EN_3PR05311-2.fm Page 6 Tuesday, June 2, 2009 4:39 PM