SiSG121917E
181
Part 7 Trial Operation and Field Settings
1. Pump Down Operation........................................................................182
2. Forced Cooling Operation ...................................................................183
3. Wiring Error Check Function ...............................................................185
4. Trial Operation ....................................................................................187
4.1 Indoor Unit............................................................................................187
4.2 Outdoor Unit .........................................................................................189
5.1 Wall Mounted and LSP Duct Type Indoor Unit.....................................191
5.2 MSP Duct Type Indoor Unit..................................................................193
5.3 Outdoor Unit .........................................................................................200
6. Silicone Grease on Power Transistor/Diode Bridge............................203
Part 7
Trial Operation and
Field Settings