SiSG121917E
Pump Down Operation
Part 7 Trial Operation and Field Settings
182
Reference
1. Pump Down Operation
Outline
In order to protect the environment, be sure to conduct pump down operation when relocating or
disposing of the unit.
Detail
1. Remove the valve caps from the liquid stop valve and the gas stop valve.
2. Carry out forced cooling operation.
3. After
A
minutes, close the liquid stop valve with a hexagonal wrench.
4. After
B
minutes, close the gas stop valve and stop the forced cooling operation.
R7000252
Refer to page 183 for forced operation.
A
B
50/65/80 class
1
5 ~ 6
90 class
3
5 ~ 6
Gas stop
valve
Close
Hexagonal
wrench
Liquid stop
valve
Valve cap