![background image](http://html.mh-extra.com/html/daikin/fbq100dvet/fbq100dvet_service-manual_2460342005.webp)
Si281313E
Procedure to Remove Switch Box (Lid)
Removal Procedure
3
2. Procedure to Remove Switch Box (Lid)
Procedure
Warning Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Step
Procedure
Points
1. Dismount the switch box
(lid).
<Inside of switch box>
1
Remove the 3 screws
of the switch box (lid).
The switch box (lid)
L1R
A2P
A1P
A3P
X9A
X2A
X3A
X6A
X10A
X25A
X27A
X16A
X70A