SiBE12-713
Outdoor Unit
Removal Procedure
297
14
The figure shows the
arrangement of the wire
harness under the
electrical box.
15
Undo the wire clip for
the thermistor lead wire.
3. Remove the electrical box
1
Loosen the 2 screws of
the earth terminal.
4. Disconnect the power
supply connecting wires
★
Illustrations are for 3 room
model.
1
Loosen the screws on
the terminal board and
disconnect the wires of
A, B, C, and D port.
Step
Procedure
Points
Summary of Contents for F-Series
Page 1: ... Applied Models Inverter Multi Cooling Only Inverter Multi Heat Pump F Series SiBE12 713 ...
Page 11: ...Introduction SiBE12 713 x ...
Page 47: ...Specifications SiBE12 713 36 Specifications ...
Page 113: ...Control Specification SiBE12 713 102 Function and Control ...
Page 122: ...SiBE12 713 Instruction Operation Manual 111 FTK X S 20 25 35 C Names of parts Indoor Unit ...
Page 235: ...Instruction SiBE12 713 224 Operation Manual ...
Page 297: ...Check SiBE12 713 286 Service Diagnosis ...