SiBE12-713
Instruction
Operation Manual
141
2.1.7
POWERFUL Operation
POWERFUL Operation
POWERFUL operation quickly maximizes the cooling
(heating) effect in any operation mode. You can get the
maximum capacity.
To start POWERFUL
operation
1. Press “POWERFUL button”.
• POWERFUL operation ends in 20 minutes.
Then the system automatically operates
again with the settings which were used
before POWERFUL operation.
• When using Powerful operation, there are
some functions which are not available.
• “
” is displayed on the LCD.
To cancel POWERFUL
operation
2. Press “POWERFUL button”
again.
• “
” disappears from the LCD.
NOTE
Notes on POWERFUL operation
• POWERFUL Operation cannot be used together with QUIET Operation. Priority is given to
the function of whichever button is pressed last.
• POWERFUL Operation can only be set when the unit is running. Pressing the operation stop button
causes the settings to be canceled, and the “
” disappears from the LCD.
•
In COOL and HEAT mode
To maximize the cooling (heating) effect, the capacity of outdoor unit must be increased
and the air flow rate be fixed to the maximum setting.
The temperature and air flow settings are not variable.
•
In DRY mode
The temperature setting is lowered by 2.5
°
C and the air flow rate is slightly increased.
•
In FAN mode
The air flow rate is fixed to the maximum setting.
TIMER
ON
CANCEL
OFF
1, 2
•
When using priority-room setting
See “Note for multi system”.
Summary of Contents for F-Series
Page 1: ... Applied Models Inverter Multi Cooling Only Inverter Multi Heat Pump F Series SiBE12 713 ...
Page 11: ...Introduction SiBE12 713 x ...
Page 47: ...Specifications SiBE12 713 36 Specifications ...
Page 113: ...Control Specification SiBE12 713 102 Function and Control ...
Page 122: ...SiBE12 713 Instruction Operation Manual 111 FTK X S 20 25 35 C Names of parts Indoor Unit ...
Page 235: ...Instruction SiBE12 713 224 Operation Manual ...
Page 297: ...Check SiBE12 713 286 Service Diagnosis ...
Page 316: ...SiBE12 713 Outdoor Unit Removal Procedure 305 Step Procedure Points ...