Flaring the pipe end 

1) Cut the pipe end with a pipe cutter.
2) Remove burrs with the cut surface facing 

downward so that the chips do not enter the pipe.

3) Put the flare nut on the pipe.
4) Flare the pipe.
5) Check that the flaring is properly made.

 WARNING

• Do not use mineral oil on flared part.
• Prevent mineral oil from getting into the system as this would reduce the lifetime of the units.
• Never use piping which has been used for previous installations. Only use parts which are delivered with the unit.
• Never install a dryer to this R410A unit in order to guarantee its lifetime.
• The drying material may dissolve and damage the system.
• Incomplete flaring may cause refrigerant gas leakage.

4.

Refrigerant piping work

 CAUTION

• Use the flare nut fixed to the main unit. (To prevent cracking of the flare nut by aged deterioration.)
• To prevent gas leakage, apply refrigeration oil only to the inner surface of the flare. (Use refrigeration oil for R410A.)
• Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage.

• Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand. Then tighten them fully with the torque 

wrenches. 

A

A

(Cut exactly at 
right angles.)

Remove burrs.

Set exactly at the position shown below.

Flaring

Die

Check

Flare’s inner surface 
must be flaw-free.

The pipe end must 
be evenly flared in 
a perfect circle.

Make sure that the 
flare nut is fitted.

0-0.5mm

Clutch-type

Flare tool for R410A

1.0-1.5mm

Clutch-type (Rigid-type)

1.5-2.0mm

Wing-nut type (Imperial-type)

Conventional flare tool

Torque wrench

Piping union

Flare nut

Flare nut

Spanner

Flare nut tightening torque

Liquid side

1/4 inch

14.2-17.2N • m

(144-175kgf • cm)

Gas side

3/8 inch

32.7-39.9N • m

(333-407kgf • cm)

Valve cap tightening torque

Liquid side

1/4 inch

21.6-27.4N • m

(220-280kgf • cm)

Gas side

3/8 inch

21.6-27.4N • m

(220-280kgf • cm)

Service port cap tightening torque

10.8-14.7N • m (110-150kgf • cm)

Do not apply refrigeration 
oil to the outer surface.

Apply refrigeration oil to 
the inner surface of the 
flare.

Do not apply refrigeration oil to 
the flare nut to avoid tightening 
with excessive torque.

[Apply oil]

[Tighten]

Summary of Contents for ERWQ02AAV3

Page 1: ...INSTALLATION MANUAL R410A Split Series Models ERWQ02AAV3...

Page 2: ...pulations des 04 overeenkomstig de bepalingen van 05 siguiendo las disposiciones de 06 secondo le prescrizioni per 07 08 de acordo com o previsto em 09 10 under iagttagelse af bestemmelserne i 11 enli...

Page 3: ...nnections or wires Improper connections or securing of wires may result in abnormal heat build up or fire When wiring the power supply and connecting the wiring between the domestic hot water tank and...

Page 4: ...unctions smoke or fire Please instruct the customer to keep the area around the unit clean The temperature of refrigerant circuit will be high please keep the inter unit wire away from copper pipes th...

Page 5: ...heard even if they are more than 3m away depending on radio wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the domestic hot w...

Page 6: ...there is a danger of the unit falling use foot bolts or wires 250mm from wall unit mm How to remove the stop valve cover Remove the screw on the stop valve cover Slide the cover downward to remove it...

Page 7: ...e foundation surface Outdoor Unit Installation 1 Installing outdoor unit 1 When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Drawings 2...

Page 8: ...rque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tighten them full...

Page 9: ...charging hose which comes from gauge manifold to gas stop valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve...

Page 10: ...is temperature 2 Be sure to insulate both the gas and liquid piping and to provide insulation dimensions as below 3 Use separate thermal insulation for gas and liquid refrigerant pipes Gas side Liquid...

Page 11: ...operation Using the outdoor unit pump down operation switch Push on SW1 with a screwdriver The operation will start Pump down operation will stop automatically after around 15 minutes To stop the ope...

Page 12: ...al block Observe the notes mentioned below when wiring to the power supply terminal block Precautions to be taken for power supply wiring CAUTION When connecting the connection wires to the terminal b...

Page 13: ...OUTDOOR Outdoor CONDENSER Condenser DISCHARGE Discharge C7 C8 Capacitor DB1 DB3 Diode bridge FU1 FU2 FU3 Fuse FU4 Field fuse IPM Intelligent power module L Live L803 L804 Reactor M1C Compressor motor...

Page 14: ...er is opened again 2 Test items Test items Symptom Check Domestic hot water tank and outdoor unit are installed properly on solid bases Fall vibration noise No refrigerant gas leaks Incomplete cooling...

Page 15: ......

Page 16: ...Copyright 2015 Daikin 4P410035 1 2015 05...

Reviews: