9
|
Electrical installation
Installer reference guide
145
ERRA08~12E + ELVH/23E
Daikin Altherma 3 R MT F
4P708474-1 – 2023.05
A
Y2
7
B
A
B
7 9
X2M
A4P
Y2
YC
X1M
a
b
a
Installation of EKRP1HBAA is required.
b
Prewiring between X2M/7+9 and Q1L (= thermal protector backup heater). Do NOT
change.
4
Fix the cable with cable ties to the cable tie mountings.
9.3.8 To connect the changeover to external heat source
INFORMATION
Bivalent is only possible in case of 1 leaving water temperature zone with:
▪
room thermostat control, OR
▪
external room thermostat control.
Wires: 2×0.75 mm²
Maximum load: 0.3 A, 250 V AC
Minimum load: 20 mA, 5 V DC
[9.C]
Bivalent
1
Open the service cover. See
"7.2.2 To open the outdoor unit"
2
Open the following (see
"7.2.6 To open the indoor unit"
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover