TRIAL OPERATION AND TESTING

Trial Operation and Testing

(1) Measure the supply voltage and make sure that it falls in the specified range.
(2) Trial operation should be carried out in either cooling or heating mode.

For Heat pump

In cooling mode, select the lowest programmable temperature; in heating mode, select the highest programmable
temperature.

Trial operation may be disabled in either mode depending on the room temperature.

After trial operation is complete, set the temperature to a normal level (26°C to 28°C in cooling mode, 20°C to 24°C in
heating mode).

For protection, the system disables restart operation for 3 minutes after it is turned off.

For Cooling Only

Select the lowest programmable temperature.

Trial operation in cooling mode may be disabled depending on the room temperature.
Use the remote control for trial operation as described below.

After trial operation is complete, set the temperature to a normal level (26°C to 28°C).

For protection, the unit disables restart operation for 3 minutes after it is turned off.

(3) Carry out the test operation in accordance with the Operation Manual to ensure that all functions and parts are working

properly.
* The air conditioner requires a small amount of power in its standby mode.  If the system is not to be used for some

time after installation, shut off the circuit breaker to eliminate unnecessary power consumption.

* If the circuit breaker trips to shut off the power to the air conditioner, the system will restore the original operation

mode when the circuit breaker is turned on again.

Test Items

Test Items

Indoor and outdoor units are installed properly on solid
bases.

No refrigerant gas leaks.

Refrigerant gas and liquid pipes and indoor drain hose
extension are thermally insulated.

Draining line is properly installed.

System is properly earthed.

The specified wires are used for interconnecting wire
connections.

Indoor or outdoor unit’s air intake or exhaust has clear
path of air.
Shut-off valves are opened.

Indoor unit properly receives remote control commands.

Symptom

(diagnostic display on RC)

Fall, vibration, noise

Incomplete cooling/heating
function

Water leakage

Water leakage

Electrical leakage

Inoperative or burn damage

Incomplete cooling/heating
function

Inoperative

Check

Trial operation from Remote Controller

(1) Press ON/OFF button to turn on the system.
(2) Simultaneously press center of TEMP button and MODE button.
(3) Press MODE button twice.

(“   ” will appear on the display to indicate that Trial Operation mode is selected.)

(4) Trial run mode terminates in approx. 30 minutes and switches into normal mode. To quit a trial operation, press ON/

OFF button.

Summary of Contents for CDKS25BVMB

Page 1: ...plit R 410A Fran ais Manuel d installation S rie split R 410A Italiano Manuale d installazione Serie Multiambienti R 410A Nederlands Montagehandleiding R 410A Split systeem Portugues Manual de Instala...

Page 2: ...eceive no external stresses Incomplete connections or clamping may cause terminal overheating or fire After connecting interconnecting and supply wiring be sure to shape the cables so that they do not...

Page 3: ...gh to support the weight of the unit If there is a risk that the ceiling is not strong enough reinforce the ceiling before installing the unit Select the signal receiver mounting location within the s...

Page 4: ...he suspension bolt positions Install the suspension bolts Use M10 size bolts for the suspension bolts In order to reinforce the ceiling bearing the weight of the unit use anchors when installing onto...

Page 5: ...nd below the hanger brackets to secure them NOTE Use washers when mounting with M8 bolts Use a water level or water filled vinyl tubes to check that the unit is level at all four corners as shown in t...

Page 6: ...g into the system as this would reduce the lifetime of the units Never use piping which has been used for previous installations Only use parts which are delivered with the unit Do never install a dri...

Page 7: ...fittings observe the following Insulation material Polyethylene foam Heat transfer rate 0 041 to 0 052kW mK 0 035 to 0 045 kcal mh C Refrigerant gas pipe s surface temperature reaches 110 C max Choos...

Page 8: ...y screw wires to the corresponding terminals 3 Connect the earth wires to the corresponding terminals 4 Pull wires to make sure that they are securely latched up then retain wires with wire retainer 5...

Page 9: ...e of the unit and push the other side gently over the 2 bends Cleaning the drain pan Clean the drain pan periodically or drain piping may be clogged with dust and may result in water leakage Ask your...

Page 10: ...power in its standby mode If the system is not to be used for some time after installation shut off the circuit breaker to eliminate unnecessary power consumption If the circuit breaker trips to shut...

Page 11: ...2P098794 3 M02B075 0210 HT...

Reviews: