BRC2E52C7 / BRC3E52C7
Installation manual
4P368041-1
–
2014.02
20
Test operation method (SkyAir only)
7-6
Select
Test Operation
and press the
Menu/Enter button. The Basic screen
returns and "Test operation" is
displayed.
7-6
Test Operation
Maintenance Contact
Field Settings
Min Setpoints Differential
External Input Interlock
Group Address
Service Settings 1/3
Setting
Return
Press the Menu/Enter
button.
7-7
Press the On/Off button within about
10 seconds. Test operation starts.
Check the operation condition for
3 minutes.
Test operation can also be
started by first performing 7-7
followed by 7-6.
NOTE
7-7
Test Operation
Press the On/Off button
(within 10 seconds).
Press the Menu/Enter
button.
<Main menu>
7-8
Press the Menu/Enter button in the
Basic screen. The Main menu is
displayed.
7-8
Setting
Return
Airflow Direction
Individual Air Direction
Quick Start
Ventilation
Energy Saving Options
Schedule
1/2
Main Menu
Press the Menu/Enter
button.
7-9
Select
Airflow Direction
and press
the Menu/Enter button.
7-10
Press the
buttons to select the
desired airflow direction and press
the Menu/Enter button. The Basic
screen returns.
7-9
7-10
Airflow Direction
Direction
Position 0
Setting
Return
Change the airflow direction
by using the
(Up/
Down) buttons.
Press the Menu/Enter
button.
7-11
Press and hold the Cancel button for
4 seconds or longer in the Basic
screen. The Service Settings menu is
displayed.
7-11
Test Operation
<Service Settings menu>
Press and hold the Cancel
button for 4 seconds or
longer while the backlight
is lit.